Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 1 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data
Entry is currently edited by Felix Ulrich-Pur on 80.120.130.63    294   Sun Dec 6 20:04:27 2020 Christian IrmlerMPW2213W13_04252.71  1   HV = 80V10 spills 

pixel scan, starting with r0 c7

 

  293   Sun Dec 6 19:51:49 2020 Christian IrmlerMPW2212W13_04252.71  1   HV = 80V10 spillsCrap

pixel scan, starting with r0 c7

stopped due to broken pipe

Caribou rebooted

  292   Sun Dec 6 19:30:38 2020 Christian IrmlerMPW2211W13_04252.71  1   HV = 80V10 spills 

pixle scan, starting with r0 c0

stopped after r0 c6 due network error (oscilloscope connected)

beam rate ~400k

hit rate MPW2: ~400 hits per spill

  291   Sun Dec 6 19:29:57 2020 Christian IrmlerMPW2210W13_04252.71  1   HV = 80V10 spills 

single pixel r0 c2

test run for new beam settings

  290   Sun Dec 6 19:07:20 2020 Christian IrmlerMPW2209W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 6s 

  289   Sun Dec 6 18:59:48 2020 Christian IrmlerMPW2208W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 2.5s (half of previous value)

  288   Sun Dec 6 16:53:35 2020 Christian IrmlerMPW2207W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r3 c3

tried to syncronized clocks of Caribou and TLU syncronized before run started.
clock of caribou is still 3s ahead. --> need to use ntp server next time.

was interrupted between spill 64 an 65 for about 40 minutes due to MAPTA error (HL-tank error)

stopped after r7 c7

  287   Sun Dec 6 16:32:54 2020 Christian IrmlerMPW2206W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r1 c6

stopped after r3 c2

stopped due to time difference of ~10s between TLU and Caribou

  286   Sun Dec 6 16:01:02 2020 Christian IrmlerMPW2205W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r0 c0

stopped after r1 c5 due to synch issues

  285   Sun Dec 6 15:57:28 2020 Christian IrmlerMPW2204W13_04252.7   1 SID0 HV = 20V10 spills 

r0 c2

  284   Sun Dec 6 15:55:13 2020 Christian IrmlerMPW2203W13_04252.7   1 SID0 HV = 1V10 spills 

r0 c2

lowest Voltage, which could be set with SMU outputs on.

  283   Sun Dec 6 15:53:12 2020 Christian IrmlerMPW2202W13_04252.7   1 SID0 HV off10 spills 

r0 c2

HV set to 0V, but KeithRC SW turned SMU output off 

  282   Sun Dec 6 15:45:45 2020 Christian IrmlerMPW2201W13_04252.7   1 SID0 HV = 100V10 spills 

r0 c2

  281   Sun Dec 6 15:44:51 2020 Christian IrmlerMPW2200W13_04252.7   1 SID0 HV = during ramping10 spillsCrap

HV = 

r0 c2

  279   Sun Dec 6 15:41:31 2020 Christian IrmlerMPW2199W13_04252.7   1 SID0 HV = 40V10 spills 

HV = 40V

r0 c2

  278   Sun Dec 6 15:38:59 2020 Christian IrmlerMPW2198W13_04252.7   1 SID0 HV = 60V10 spills 

HV = 60V

r0 c2

  277   Sun Dec 6 15:37:05 2020 Christian IrmlerMPW2197W13_04252.7   1 SID0 HV = 80V10 spills 

HV = 80V

r0 c2

  276   Sun Dec 6 13:59:35 2020 Christian IrmlerMPW2196W13_04252.7   1 SID0    

Testrun to check number of hits per splill --> ~5k hits per spill

  275   Sun Dec 6 12:52:17 2020 Christian IrmlerMPW2 setup and configuration             

First testbeam with MPW2, Setup as depicted in attachment 1,

Default beam setting EFE/SID0 252 MeV, released setting 

TRIMDAC config from Friday: trimconfig_W13_04_80V_06_12_13_00 - New trimdac run taken on Sunday! 

 

Attachment 1: Setup_for_first_MPW2_Beamtest.pdf
Attachment 2: Shiftplan_MPW2shift_2020-12-06.pdf
  274   Sat Nov 21 21:30:16 2020 Patrick Sieberer2020-11-2145Diamond + DSSD tracker80010602010  none 3900000Unknown

tracking, (with switched APV channels)

Due to invers bias, p- and n-side of diamond are also flipped!

ELOG V3.1.5-fc6679b