Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2019, Page 6 of 7  Not logged in ELOG logo
ID Date Author Subject DUTup Beam Energy Beam Setting Run Number Events PhantomType PhantomAngle
  41   Sun Jul 14 21:05:29 2019 Alexander Burker2019-07-13f proton CTDrehtisch252.7MAPI Degrader 90366811Alu80

Trigger: Coincidence using MaltaPix, planes 1 and 3

pCT

timing setting 43

 

 

  42   Sun Jul 14 21:10:52 2019 Alexander Burker2019-07-13f proton CTDrehtisch252.7MAPI Degrader 90374038Alu80

Trigger: Coincidence using MaltaPix, planes 1 and 3

pCT

timing setting 43

 

 

  43   Sun Jul 14 21:20:23 2019 Alexander Burker2019-07-13f proton CTDrehtisch252.7MAPI Degrader 90387796Alu80

Trigger: Coincidence using MaltaPix, planes 1 and 3

pCT

timing setting 43

 

  44   Sun Jul 14 21:29:21 2019 Alexander Burker2019-07-13f proton CTDrehtisch252.7EFE, QuadScan SID03987680Alu80

No TERA data available

Trigger: Coincidence using MaltaPix, planes 1 and 3

pCT

timing setting 43

 

 

  45   Sun Jul 14 21:51:01 2019 Alexander Burker2019-07-13f proton CTDrehtisch252.7EFE, QuadScan SID04043679Alu0

Trigger: Coincidence using MaltaPix, planes 1 and 3

pCT

timing setting 43

 

 

  120   Tue Nov 26 13:39:51 2019 Alexander Burker2019-11-23f proton CTDrehtisch100.4 42 Alu0

2019-11-24 17:21

TERA DAQ failed

  121   Tue Nov 26 13:40:21 2019 Alexander Burker2019-11-23f proton CTDrehtisch100.4 43313433Alu0

2019-11-24 17:21

Run was interrupted to re-load config. A regular pattern in the hit maps suggested a problem with FIR, however the data looks good and a projection could be reconstructed

  122   Tue Nov 26 13:46:13 2019 Alexander Burker2019-11-23f proton CTDrehtisch100.4 44687822Alu0

2019-11-24 17:54

I've forgotten to increment run number before pressing start. Run 43 was likely renamed to oldName_2019-11-24….xml and .dat

To correctly filter the issues due to FIR, Hao suggested using a neighbor cut of 15 to 20.

  123   Tue Nov 26 13:48:56 2019 Alexander Burker2019-11-23f proton CTDrehtisch100.4 45 Alu90

2019-11-24 18:57

TERA DAQ failed

  124   Tue Nov 26 13:58:58 2019 Alexander Burker2019-11-23f proton CTDrehtisch100.4 461001850Alu90

2019-11-24 18:59 - 20:27

  125   Tue Nov 26 13:59:48 2019 Alexander Burker2019-11-23f proton CTDrehtisch100.4 47 Alu45

2019-11-24 20:28

TERA DAQ failed

  126   Tue Nov 26 14:00:20 2019 Alexander Burker2019-11-23f proton CTDrehtisch100.4 48101432Alu45

2019-11-24 20:28 - 22:00

  100   Tue Nov 5 10:50:08 2019 Florian PittersLGAD Setups on 20. and 25.10. ShiftLGAD      

Setup 1 (on 20.10.2019):

  • With Cividec

  • Position: beam center, ch3 (diode 1) in front, ch4 (diode 3) in the rear

  • RMS: ca. 23 mV, 24 mV

  • Trigger on Ch3: ca. 250 mV

  • Osci amplitude/div: 200 mV or 800 MeV, 400 mV for lower energies

 

Setup 2 (on 20.10.2019):

  • Same as setup 1 but 1 cm to the top from beam center

 

Setup 3 (on 25.10.2019):

  • Same as setup 1 but with Osci amplitude/div: 1V

 

Setup 4 (on 25.10.2019):

  • No Cividec

  • Postion: Same as setup 1

  • RMS: ca. 0.3 mV, 0.3 mV

  • Trigger: 3 mV

  • Osci amplitude/div: 10 mV

  127   Fri Jan 24 09:33:12 2020 Alexander Burker2019-07-13f MaltaPixMALTA800EFE 1us , Degrader20, changed gain orb, no betatron, chopper 601017 none 

Corresponds to DSSD tracker Run 8 (https://elog.hephy.at/testbeam-MA2019/10)

Trigger: Coincidence using Scintillators

  128   Fri Jan 24 09:39:08 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21018 Alu0

Corresponds to DSSD tracker Run 9 (https://elog.hephy.at/testbeam-MA2019/11)

Trigger: Coincidence using Scintillators

  129   Fri Jan 24 09:40:11 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21019 Alu20

Corresponds to DSSD tracker Run 10 (https://elog.hephy.at/testbeam-MA2019/14)

Trigger: Coincidence using Scintillators

  130   Fri Jan 24 09:42:59 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21020 Alu20

Corresponds to DSSD tracker Run 11 (https://elog.hephy.at/testbeam-MA2019/15)

Trigger: Coincidence using Scintillators

  131   Fri Jan 24 09:44:49 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21022 Alu20

Corresponds to DSSD tracker Run 12 (https://elog.hephy.at/testbeam-MA2019/17)

Trigger: Coincidence using Scintillators

 

  132   Fri Jan 24 09:45:52 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21023 Alu40

Corresponds to DSSD tracker Run 13 (https://elog.hephy.at/testbeam-MA2019/18)

Trigger: Coincidence using Scintillators

  12   Sat Jul 13 18:42:24 2019 Alexander Burker2019-07-13f proton CTSketch pCT Setup    

Big Line: DSSD
Small Line: Malta
Small Square: Phantom
Small Rectangle: Trigger Scintillator
Big Rectangle: TERA

Beam is coming in from Left to Right

Attachment 1: image.png
image.png
Attachment 2: Shift_13_(2).png
Shift_13_(2).png
ELOG V3.1.5-fc6679b