ID |
Date |
Author |
Subject |
DUT |
Beam Energy |
Beam Setting |
Run Number |
Events |
PhantomType |
PhantomAngle |
14
|
Sat Jul 13 19:09:24 2019 |
Alexander Burker | 2019-07-13f proton CT | Drehtisch | 145.4 | EFE, QuadScan SID2 | 10 | 403192 | Alu | 20 |
Trigger: Coincidence using Scintillators
pCT
timing setting 41
|
15
|
Sat Jul 13 19:54:19 2019 |
Alexander Burker | 2019-07-13f proton CT | Drehtisch | 145.4 | EFE, QuadScan SID2 | 11 | 402830 | Alu | 20 |
Trigger: Coincidence using Scintillators
pCT
timing setting 41
|
17
|
Sat Jul 13 20:31:25 2019 |
Alexander Burker | 2019-07-13f proton CT | Drehtisch | 145.4 | EFE, QuadScan SID2 | 12 | 420714 | Alu | 20 |
Trigger: Coincidence using Scintillators
pCT
timing setting 41
|
129
|
Fri Jan 24 09:40:11 2020 |
Alexander Burker | 2019-07-13f MaltaPix | MALTA | 145.4 | EFE, QuadScan SID2 | 1019 | | Alu | 20 |
Corresponds to DSSD tracker Run 10 (https://elog.hephy.at/testbeam-MA2019/14)
Trigger: Coincidence using Scintillators |
130
|
Fri Jan 24 09:42:59 2020 |
Alexander Burker | 2019-07-13f MaltaPix | MALTA | 145.4 | EFE, QuadScan SID2 | 1020 | | Alu | 20 |
Corresponds to DSSD tracker Run 11 (https://elog.hephy.at/testbeam-MA2019/15)
Trigger: Coincidence using Scintillators |
131
|
Fri Jan 24 09:44:49 2020 |
Alexander Burker | 2019-07-13f MaltaPix | MALTA | 145.4 | EFE, QuadScan SID2 | 1022 | | Alu | 20 |
Corresponds to DSSD tracker Run 12 (https://elog.hephy.at/testbeam-MA2019/17)
Trigger: Coincidence using Scintillators
|
11
|
Sat Jul 13 17:30:56 2019 |
Alexander Burker | 2019-07-13f proton CT | Drehtisch | 145.4 | EFE, QuadScan SID2 | 9 | 1202312 | Alu | 0 |
Trigger: Coincidence using Scintillators
pCT
timing setting 41
|
45
|
Sun Jul 14 21:51:01 2019 |
Alexander Burker | 2019-07-13f proton CT | Drehtisch | 252.7 | EFE, QuadScan SID0 | 40 | 43679 | Alu | 0 |
Trigger: Coincidence using MaltaPix, planes 1 and 3
pCT
timing setting 43
|
120
|
Tue Nov 26 13:39:51 2019 |
Alexander Burker | 2019-11-23f proton CT | Drehtisch | 100.4 | | 42 | | Alu | 0 |
2019-11-24 17:21
TERA DAQ failed |
121
|
Tue Nov 26 13:40:21 2019 |
Alexander Burker | 2019-11-23f proton CT | Drehtisch | 100.4 | | 43 | 313433 | Alu | 0 |
2019-11-24 17:21
Run was interrupted to re-load config. A regular pattern in the hit maps suggested a problem with FIR, however the data looks good and a projection could be reconstructed |
122
|
Tue Nov 26 13:46:13 2019 |
Alexander Burker | 2019-11-23f proton CT | Drehtisch | 100.4 | | 44 | 687822 | Alu | 0 |
2019-11-24 17:54
I've forgotten to increment run number before pressing start. Run 43 was likely renamed to oldName_2019-11-24….xml and .dat
To correctly filter the issues due to FIR, Hao suggested using a neighbor cut of 15 to 20. |
128
|
Fri Jan 24 09:39:08 2020 |
Alexander Burker | 2019-07-13f MaltaPix | MALTA | 145.4 | EFE, QuadScan SID2 | 1018 | | Alu | 0 |
Corresponds to DSSD tracker Run 9 (https://elog.hephy.at/testbeam-MA2019/11)
Trigger: Coincidence using Scintillators |
1
|
Sat Jul 13 12:14:55 2019 |
Thomas Bergauer | | Drehtisch | | | | | | |
Settings |
2
|
Sat Jul 13 13:32:30 2019 |
Thomas Bergauer | 2019-07-13f proton CT | DSSD-Tracker | | EFE, QuadScan SID2 | 1 | | none | |
Trigger: Coincidence using Scintillators
timing setting 41 (*32ns)
using 16ns cables from our scintialltors to TLU |
12
|
Sat Jul 13 18:42:24 2019 |
Alexander Burker | 2019-07-13f proton CT | Sketch | | pCT Setup | | | | |
Big Line: DSSD
Small Line: Malta
Small Square: Phantom
Small Rectangle: Trigger Scintillator
Big Rectangle: TERA
Beam is coming in from Left to Right |
13
|
Sat Jul 13 18:52:33 2019 |
Alexander Burker | 2019-07-13f proton CT | Sketch | | TERA Calibration Setup | | | | |
|
16
|
Sat Jul 13 20:17:38 2019 |
Felix Ulrich-Pur | | TERA-Cal | 800 | | | | none | |
Calibrated Voltage settings
P Voltage: 69V
Q Voltage: 76,8V
R Voltage: 68,65V
S Voltage: 68,9 V |
46
|
Tue Sep 24 11:12:45 2019 |
Alexander Burker | | Sketch | | | | | | |
Notes of the planned order of modules within beam (and reserve modules), before switching out the first one |
47
|
Fri Oct 25 18:09:21 2019 |
Alexander Burker | 2019-10-20 Low Flux | | 800 | EFE 1us, Degrader10, changed gain orb, gain 6, betatron10, no chopper | 1 | 22743 | none | |
06:25
WRONG GAIN ON THE ORB
tracker was not properly configured at the beginning, but now is working
many empty spills
 
|
48
|
Fri Oct 25 18:21:58 2019 |
Alexander Burker | 2019-10-20 Low Flux | | 800 | EFE 1us, Degrader20, changed gain orb, gain 6, no betatron, chopper 60 | 2 | 22841 | none | |
06:36
WRONG GAIN ON THE ORB
lots of empty spills
 
|