Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2019, Page 1 of 7  Not logged in ELOG logo
ID Date Author Subjectup DUT Beam Energy Beam Setting Run Number Events PhantomType PhantomAngle
  1   Sat Jul 13 12:14:55 2019 Thomas Bergauer Drehtisch      

Settings 

Attachment 1: Bildschirmfoto_2019-07-13_um_12.13.24.png
Bildschirmfoto_2019-07-13_um_12.13.24.png
Attachment 2: Bildschirmfoto_2019-07-13_um_12.13.35.png
Bildschirmfoto_2019-07-13_um_12.13.35.png
  Draft   Sat Jul 13 13:34:40 2019 Thomas Bergauer DSSD-Tracker800EFE_quad22 nonealignment run
  16   Sat Jul 13 20:17:38 2019 Felix Ulrich-Pur TERA-Cal800   none 

Calibrated Voltage settings

P Voltage: 69V

Q Voltage: 76,8V

R Voltage: 68,65V

S Voltage: 68,9 V

Attachment 1: DACsettings_after_calibration.txt
1    P    1    1,000000
2    R    1    1,650000
3    P    2    1,500000
4    R    2    2,000000
5    P    3    1,600000
6    R    3    0,900000
7    P    4    1,500000
8    R    4    0,700000
9    P    5    1,200000
10    R    5    0,200000
11    P    6    1,500000
12    R    6    0,900000
13    P    7    1,400000
14    R    7    1,100000
15    P    8    1,000000
16    R    8    1,500000
17    P    9    1,800000
18    R    9    1,300000
19    P    10    1,500000
20    R    10    0,700000
21    P    11    1,300000
22    R    11    1,000000
23    P    12    1,500000
24    R    12    1,500000
25    Q    1    0,000000
26    S    1    0,900000
27    Q    2    0,400000
28    S    2    1,300000
29    Q    3    0,700000
30    S    3    2,100000
31    Q    4    0,000000
32    S    4    0,800000
33    Q    5    0,400000
34    S    5    1,300000
35    Q    6    0,400000
36    S    6    1,100000
37    Q    7    0,500000
38    S    7    0,800000
39    Q    8    1,000000
40    S    8    1,300000
41    Q    9    1,000000
42    S    9    1,300000
43    Q    10    0,900000
44    S    10    1,300000
45    Q    11    0,300000
46    S    11    1,500000
47    Q    12    1,000000
48     S    12    1,500000
  46   Tue Sep 24 11:12:45 2019 Alexander Burker Sketch      

Notes of the planned order of modules within beam (and reserve modules), before switching out the first one

Attachment 1: Modules.jpg
Modules.jpg
  99   Tue Oct 29 14:13:20 2019 Alexander Burker 2019-10-25 Low Flux   36656none 

  127   Fri Jan 24 09:33:12 2020 Alexander Burker2019-07-13f MaltaPixMALTA800EFE 1us , Degrader20, changed gain orb, no betatron, chopper 601017 none 

Corresponds to DSSD tracker Run 8 (https://elog.hephy.at/testbeam-MA2019/10)

Trigger: Coincidence using Scintillators

  128   Fri Jan 24 09:39:08 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21018 Alu0

Corresponds to DSSD tracker Run 9 (https://elog.hephy.at/testbeam-MA2019/11)

Trigger: Coincidence using Scintillators

  129   Fri Jan 24 09:40:11 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21019 Alu20

Corresponds to DSSD tracker Run 10 (https://elog.hephy.at/testbeam-MA2019/14)

Trigger: Coincidence using Scintillators

  130   Fri Jan 24 09:42:59 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21020 Alu20

Corresponds to DSSD tracker Run 11 (https://elog.hephy.at/testbeam-MA2019/15)

Trigger: Coincidence using Scintillators

  131   Fri Jan 24 09:44:49 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21022 Alu20

Corresponds to DSSD tracker Run 12 (https://elog.hephy.at/testbeam-MA2019/17)

Trigger: Coincidence using Scintillators

 

  132   Fri Jan 24 09:45:52 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21023 Alu40

Corresponds to DSSD tracker Run 13 (https://elog.hephy.at/testbeam-MA2019/18)

Trigger: Coincidence using Scintillators

  2   Sat Jul 13 13:32:30 2019 Thomas Bergauer2019-07-13f proton CTDSSD-Tracker EFE, QuadScan SID21 none 

Trigger: Coincidence using Scintillators

timing setting 41 (*32ns)

using 16ns cables from our scintialltors to TLU

  4   Sat Jul 13 13:43:06 2019 Alexander Burker2019-07-13f proton CTDSSD-Tracker252.7EFE, QuadScan SID2212886nonenone

Trigger: Coincidence using MaltaPix

timing setting 43

 

  5   Sat Jul 13 14:01:36 2019 Alexander Burker2019-07-13f proton CTTERA-Cal145.4EFE, QuadScan SID23302912nonenone

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

 

  6   Sat Jul 13 14:13:33 2019 Alexander Burker2019-07-13f proton CTTERA-Cal100.4EFE, QuadScan SID24531644nonenone

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

 

  7   Sat Jul 13 15:21:18 2019 Alexander Burker2019-07-13f proton CTTERA-Cal83EFE, QuadScan SID25195212nonenone

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

  8   Sat Jul 13 15:48:48 2019 Alexander Burker2019-07-13f proton CTTERA-Cal62.4EFE, QuadScan SID2610384nonenone

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

 

  9   Sat Jul 13 16:14:00 2019 Alexander Burker2019-07-13f proton CTTERA-Cal800EFE 1us , Degrader10, changed gain orb, betatron10, no chopper718471nonenone

Trigger: Coincidence using Scintillators

Alignment

timing setting 41

abgebrochen wegen instabilem beam

 

  10   Sat Jul 13 16:36:32 2019 Alexander Burker2019-07-13f proton CTTERA-Cal800EFE 1us , Degrader20, changed gain orb, no betatron, chopper 608108089nonenone

Trigger: Coincidence using Scintillators

Alignment

timing setting 41

 

  11   Sat Jul 13 17:30:56 2019 Alexander Burker2019-07-13f proton CTDrehtisch145.4EFE, QuadScan SID291202312Alu0

Trigger: Coincidence using Scintillators

pCT

timing setting 41

 

 

ELOG V3.1.5-fc6679b