Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 5 of 5  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Jan 26 19:12:42 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_002, 4 M, 25.01.2014 22:30, 26.01.2014 15:15, Good 

HV at 300V; I at app. 11µA 4GeV, Single mode

 

Entry  Tue Jan 7 21:34:41 2014, Markus Friedl, Infineon, run, run033, 4.117.024 (4M), 07.01.2014 21:33:12, 08.01.2014 08:52:37, Good 

HV=300V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

 

beam gone at 8:00 morning because of scheduled beam development. last few 100 events only noise.

Entry  Fri Jan 24 00:21:16 2014, Hao Yin, , AIDA, HW_AIDA001, 40k, 24.02.2014 00:18, , Unknown 

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ...

Entry  Fri Jan 10 00:58:46 2014, Markus Friedl, AIDA, run, run048, 500k, 10.01.2014 00:57:48, 10.01.2014 08:17:57, Good 

HV=90V  I=3.9uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Tue Jan 7 09:22:09 2014, Thomas Bergauer, , run, run016, 50k, 07.01.2014 09:19:10, 07.01.2014 09:30:03, Good 
HV=290V  I=9.00uA
position move back to original position (0mm/0mm) (not hitting the right APVs anymore)

DESY table z=-346 x=-255 

Entry  Sun Jan 12 18:04:18 2014, Markus Friedl, AIDA, run, run056, 510k, 12.01.2014 17:59:57, 13.01.2014 01:47:50, Good 

HV=100V  I=3.7uA
position = -25 / 0 mm relative to initial
5GeV beam, 6 samples
narrow timing (trigger width)

Something strange with x/y stage: stuck at approximately y=+3.5 (hitting box lid?), now back to 0, but about 180 strips off compared to run054 (y=0 as well)...

Entry  Tue Jan 7 11:52:27 2014, Markus Friedl, Infineon, run, run019, 650k, 07.01.2014 11:47:24, 07.01.2014 13:15:21, Good 

HV=300V  I=9.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single sample run

Beam energy = 3 GeV

Entry  Fri Jan 24 11:23:15 2014, Hao Yin, , AIDA, HW_AIDA003, 76356, 24.02.2014 10:30, 24.02.2014 11:22, Unknown 

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ...

Entry  Sat Jan 11 22:32:19 2014, Markus Friedl, AIDA, run, run054, 800k, 11.01.2014 22:30:44, 12.01.2014 10:13:10, Good 

HV=150V  I=5.3uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Mon Jan 27 12:20:53 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_004, 800k, 27.01.2014 09:10, 27.01.2014 12:15, Good 

HV at 300V; I at app. 10µA 3GeV, Single mode

 

Entry  Sat Jan 25 18:28:38 2014, Wolfgang Treberspurg, Infineon, Calibration run Infineon Stack 2, Calibration_Run_Infineon_Stack2_001, 82900, 25.01.2014 10:15, 25.01.2014 10:25, Unknown 

HV 300V, I ca. 11µA single mode

Entry  Wed Jan 8 12:40:30 2014, Thomas Bergauer, AIDA, intcal AIDA Stack, cal034, 83.8k, 08.01.2014 12:32:22, 08.01.2014 13:01:30, Unknown 

 HV=100V  I=4.5uA

position adapted to center beam
 
Entry  Sat Jan 4 16:30:46 2014, Markus Friedl, Infineon, cal, cal001, 83800, 04.01.2014 16:16:51, 04.01.2014 16:25:46, Good 

HV=300V  I=9.3uA  (total)

Entry  Sun Jan 5 15:08:09 2014, Markus Friedl, AIDA, cal, cal002, 83800, 05.01.2014 15:01:32, 05.01.2014 15:30:36, Good 

HV=100V  I=6uA

Entry  Thu Jan 9 10:10:31 2014, Markus Friedl, AIDA, cal, cal038, 83800, 09.01.2014 10:09:27, 09.01.2014 10:38:23, Good 

HV=100V  I=4.2uA
centered position
5GeV beam, single sample
narrow timing (trigger width)

Entry  Thu Jan 23 22:47:49 2014, Hao Yin, , AIDA, CalibrationRun001, 83800, 23.01.2014 13:35:55, 23.01.2014 02:08:15, Good 

taken with tuxdaq...

HV=75V  I=?3.7uA?
position = 0 / -30 mm relative to initial (but again centered) ?
?5GeV beam, single sample? (software trigger run)
?narrow timing (trigger width)?

Entry  Mon Jan 13 01:58:14 2014, Markus Friedl, AIDA, run, run057, 900k, 13.01.2014 01:56:26, 13.01.2014 10:48:22, Good 

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered)
5GeV beam, single sample
narrow timing (trigger width)

ELOG V3.1.5-fc6679b