ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Data |
55
|
Thu Jan 9 23:27:27 2014 |
Markus Friedl | AIDA | run | run047 | 100k | 09.01.2014 23:26:35 | 10.01.2014 00:52:56 | Good |
HV=80V I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)
|
56
|
Fri Jan 10 00:58:46 2014 |
Markus Friedl | AIDA | run | run048 | 500k | 10.01.2014 00:57:48 | 10.01.2014 08:17:57 | Good |
HV=90V I=3.9uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)
|
57
|
Fri Jan 10 08:21:46 2014 |
Markus Friedl | AIDA | run | run049 | 100k | 10.01.2014 08:20:49 | 10.01.2014 09:49:46 | Good |
HV=100V I=4.2uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)
|
58
|
Fri Jan 10 09:54:11 2014 |
Markus Friedl | AIDA | run | run050 | 100k | 10.01.2014 09:53:13 | 10.01.2014 11:21:12 | Good |
HV=110V I=4.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)
|
59
|
Fri Jan 10 11:02:31 2014 |
Markus Friedl | Belle SVD | Power supply | | | 10.01.2014 11:00:00 | | Unknown |
|
Attachment 1: KenWood100114.png
|
|
60
|
Fri Jan 10 11:26:54 2014 |
Markus Friedl | AIDA | run | run051 | 100k | 10.01.2014 11:26:08 | 10.01.2014 12:53:12 | Good |
HV=120V I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)
|
61
|
Fri Jan 10 13:04:49 2014 |
Markus Friedl | AIDA | run | run052 | 100k | 10.01.2014 13:04:05 | 10.01.2014 14:30:18 | Good |
HV=130V I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)
|
62
|
Sat Jan 11 20:56:29 2014 |
Markus Friedl | AIDA | run | run053 | 100k | 11.01.2014 20:55:29 | 11.01.2014 22:25:43 | Good |
HV=140V I=7.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)
|
63
|
Sat Jan 11 22:32:19 2014 |
Markus Friedl | AIDA | run | run054 | 800k | 11.01.2014 22:30:44 | 12.01.2014 10:13:10 | Good |
HV=150V I=5.3uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)
|
64
|
Sun Jan 12 10:36:37 2014 |
Markus Friedl | AIDA | run | run055 | 310913 | 12.01.2014 10:34:44 | 12.01.2014 15:42:47 | Good |
HV=100V I=3.6uA
position = 23 / -35 mm relative to before
5GeV beam, 6 samples
narrow timing (trigger width)
|
65
|
Sun Jan 12 18:04:18 2014 |
Markus Friedl | AIDA | run | run056 | 510k | 12.01.2014 17:59:57 | 13.01.2014 01:47:50 | Good |
HV=100V I=3.7uA
position = -25 / 0 mm relative to initial
5GeV beam, 6 samples
narrow timing (trigger width)
Something strange with x/y stage: stuck at approximately y=+3.5 (hitting box lid?), now back to 0, but about 180 strips off compared to run054 (y=0 as well)... |
66
|
Mon Jan 13 01:58:14 2014 |
Markus Friedl | AIDA | run | run057 | 900k | 13.01.2014 01:56:26 | 13.01.2014 10:48:22 | Good |
HV=100V I=3.7uA
position = 0 / -30 mm relative to initial (but again centered)
5GeV beam, single sample
narrow timing (trigger width) |
67
|
Mon Jan 13 12:02:40 2014 |
Markus Friedl | common | Kontakt | | | | | Unknown |
Richard Thalmeier Tel. 4801
Hao Yin |
69
|
Thu Jan 23 22:47:49 2014 |
Hao Yin | | AIDA | CalibrationRun001 | 83800 | 23.01.2014 13:35:55 | 23.01.2014 02:08:15 | Good |
taken with tuxdaq...
HV=75V I=?3.7uA?
position = 0 / -30 mm relative to initial (but again centered) ?
?5GeV beam, single sample? (software trigger run)
?narrow timing (trigger width)? |
70
|
Fri Jan 24 00:21:16 2014 |
Hao Yin | | AIDA | HW_AIDA001 | 40k | 24.02.2014 00:18 | | Unknown |
HV=100V I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ... |
72
|
Fri Jan 24 11:23:15 2014 |
Hao Yin | | AIDA | HW_AIDA003 | 76356 | 24.02.2014 10:30 | 24.02.2014 11:22 | Unknown |
HV=100V I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ... |
68
|
Sun Jan 19 18:01:46 2014 |
Christian Irmler | common | AIDA setup operated with TuxDAQ | | | | | Unknown |
New SIS driver version sis1100-2.13-3 installed on DAQPC.
To install the driver call as root:
cd /lib/modules/2.6.18-371.3.1.el5/extra
/sbin/modprobe sis1100
Check if /dev/sis* are created.
Managed to run the AIDA setup with old TuxDAQ version from T. Obermayer.
Will now try to install a newer version, which also supports ADC delay scan and internal calibration. |