Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 3 of 5  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTimedown EndTime Data
  55   Thu Jan 9 23:27:27 2014 Markus FriedlAIDArunrun047100k09.01.2014 23:26:3510.01.2014 00:52:56Good

HV=80V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  54   Thu Jan 9 21:41:20 2014 Markus FriedlAIDArunrun046100k09.01.2014 21:40:2909.01.2014 23:07:16Good

HV=70V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  53   Thu Jan 9 19:37:33 2014 Markus FriedlAIDArunrun045100k09.01.2014 19:36:2109.01.2014 21:01:31 Good

HV=60V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  52   Thu Jan 9 18:09:40 2014 Markus FriedlAIDArunrun044100k09.01.2014 18:08:1909.01.2014 19:35:21Good

HV=50V  I=3.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

MOVED TIMING by 1 clock (now signal is centered again)

  51   Thu Jan 9 16:36:30 2014 Markus FriedlAIDArunrun042100k09.01.2014 16:35:4309.01.2014 18:02:17Good

HV=40V  I=3.4uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

  49   Thu Jan 9 14:07:31 2014 Markus FriedlAIDArunrun041100k09.01.2014 14:06:3209.01.2014 15:33:13Good

HV=30V  I=3.3uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

  48   Thu Jan 9 12:31:29 2014 Markus FriedlAIDArunrun040100k09.01.2014 12:30:3209.01.2014 13:55:47Good

HV=20V  I=2.9uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

  47   Thu Jan 9 11:04:34 2014 Markus FriedlAIDArunrun039100k09.01.2014 11:02:3609.01.2014 12:28:41Good

HV=10V  I=2.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

  45   Thu Jan 9 10:10:31 2014 Markus FriedlAIDAcalcal0388380009.01.2014 10:09:2709.01.2014 10:38:23Good

HV=100V  I=4.2uA
centered position
5GeV beam, single sample
narrow timing (trigger width)

  44   Wed Jan 8 22:19:11 2014 Markus FriedlAIDArunrun0371.2M08.01.2014 22:18:3009.01.2014 10:08:14Good

HV=100V  I=4.4uA
centered position
5GeV beam, single sample
narrow timing (trigger width)

 

  43   Wed Jan 8 17:20:40 2014 Markus FriedlAIDArunrun036320k08.01.2014 17:18:5108.01.2014 22:14:58Unknown

 HV=100V  I=4.3uA

centered position

5GeV beam

narrow timing (trigger width), but 6 samples

 

  42   Wed Jan 8 14:10:07 2014 Thomas BergauerAIDArunrun03521168108.01.2014 14:01:2508.01.2014 17:03:55Unknown

 HV=100V  I=4.2uA

position adapted to center beam
 

accidentally hit reset button on PC which ended this run abruptly...

 

5 GeV beam

  41   Wed Jan 8 12:40:30 2014 Thomas BergauerAIDAintcal AIDA Stackcal03483.8k08.01.2014 12:32:2208.01.2014 13:01:30Unknown

 HV=100V  I=4.5uA

position adapted to center beam
 
  24   Tue Jan 7 11:50:34 2014 Markus FriedlInfineonscanrun018x10k07.01.2014 11:xx:xx07.01.2014 11:xx:xxGood

Delay scan with single sample

Several runs

  40   Tue Jan 7 21:34:41 2014 Markus FriedlInfineonrunrun0334.117.024 (4M)07.01.2014 21:33:1208.01.2014 08:52:37Good

HV=300V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

 

beam gone at 8:00 morning because of scheduled beam development. last few 100 events only noise.

  39   Tue Jan 7 21:02:58 2014 Markus FriedlInfineonrunrun032200k07.01.2014 21:01:4207.01.2014 21:29:03Good

HV=290V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  38   Tue Jan 7 20:26:50 2014 Markus FriedlInfineonrunrun031200k07.01.2014 20:25:3207.01.2014 20:58:47Good

HV=280V  I=8.4uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  37   Tue Jan 7 19:44:45 2014 Markus FriedlInfineonrunrun030200k07.01.2014 19:43:3507.01.2014 20:11:03Good

HV=270V  I=8.6uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  36   Tue Jan 7 19:12:07 2014 Markus FriedlInfineonrunrun029200k07.01.2014 19:11:0507.01.2014 19:38:00Good

HV=260V  I=8.7uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  35   Tue Jan 7 18:41:55 2014 Markus FriedlInfineonrunrun028200k07.01.2014 18:40:4007.01.2014 19:07:32Good

HV=250V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

ELOG V3.1.5-fc6679b