HV=100V I=4.2uA
accidentally hit reset button on PC which ended this run abruptly...
5 GeV beam
HV=300V I=8.3uA
position adapted to center beam better (+10mm horizontal)
narrow trigger width (~5ns)
single trigger
Beam energy = 3 GeV
beam gone at 8:00 morning because of scheduled beam development. last few 100 events only noise.
HV=290V I=8.3uA
HV=280V I=8.4uA
HV=270V I=8.6uA
HV=260V I=8.7uA
HV=250V I=8.3uA
HV=240V I=8.2uA
HV=230V I=8.2uA
HV=220V I=8.1uA
HV=210V I=8.1uA
HV=200V I=8.0uA
HV=150V I=7.3uA
HV=100V I=7.2uA
HV=300V I=8.5uA
multi6 with same settings as run019 (htr+3)
HV=300V I=9.2uA
single sample run
Delay scan with single sample
Several runs
DESY table z=-346 x=-255
3Gev/c
HV=290V I=9.55uA