Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 1 of 5  Not logged in ELOG logo
Entry  Mon Jan 6 19:10:36 2014, Thomas Bergauer, common, Beam Momentum 3GeV/c, run001 to run012, , , , Unknown IMG_1517.jpgIMG_1516.jpg

We have set the beam momentum to 3 GeV 

Entry  Tue Jan 7 02:17:14 2014, Thomas Bergauer, , beam momentum 6GeV/c, run013, , , , Unknown 
 
Entry  Tue Jan 7 09:33:51 2014, Thomas Bergauer, common, beam momentum back to 3Gev/c, run014 and later ones, , , , Unknown 
 
Entry  Tue Jan 7 14:51:45 2014, Thomas Bergauer, Belle SVD, TLU control, , , , , Unknown 

1. ssh bastion

2. ssh belle-control

3. ssh telescope-admin@tb-aconite
(password telescope++)

dann:

How to generate trigger from TLU through FTSW to detector systems
2014.1.6 Mikihiko Nakao

* step 1 - open monitor window to show the FTSW status

 [you@bastion03 ~]$ ssh telescope-admin@belle-rpc1
  (still only limited people has access to b2daq account:
   ask DAQ people or Katsuro Nakamura of SVD group)

 [b2daq@belle-rpc1 ~]$ ssh telescope-admin@ttd10
 [b2daq@ttd10 ~]$ statft -55 -i -c
   (55 is the FTSW board-id, -i -c are to show the status repeatedly)

* step 2 - initialize FTSW to accept TLU trigger

 [b2daq@ttd10 ~]$ trigft -55 tlu

* step 3 - start trigger at TLU

 [you@bastion03 ~]$ ssh belle-rpc2
 [you@belle-rpc2 ~]$ ssh telescope-admin@tb-aconite
  (ask Alan Campbell or somebody for the password)

 telescope-admin@tb-aconite:~$ cd eudaq-nakao/bin
 ...$ ./TLUControl.exe -a 4 -d 1 -i RJ45 -w 10 -n

 here, -a option gives the possible trigger coincidence
  (-a 1  --- dummy trigger generator from FTSW)
   -a 2  --- trigger counter 1 only
   -a 4  --- trigger counter 2 only
   -a 8  --- trigger counter 3 only
   -a 6  --- trigger counter 1 and 2
   -a 10 --- trigger counter 1 and 3
   -a 12 --- trigger counter 2 and 2
   -a 14 --- trigger counter 1 and 2 and 3
 other options are kept to be the same
   -d 1 -i RJ45 --- connection to FTSW
   -w 10        --- update frequency (10msec)
   -n           --- suppress messages

 This gives you output like:

   Status:    00,--,--,--,--,-- (0,0)
   Scalers:   0, 7, 0, 0    <== from FTSW-dummy and trigger counters 1, 2, 3
   Particles: 1
   Triggers:  0             <== actual trigger to be distributed to FTSW
   Entries:   0
   TS errors: 0, 0 (redundancy, re-read)
   Timestamp: 0x4f25a008 (1327865864) = 3.45791
   Time: 3.463 s, Freq: 0 Hz, Average: 0 Hz

- 

Entry  Thu Jan 9 11:02:14 2014, Markus Friedl, AIDA, info, , , , , Unknown 

Created bad strip masks for the AIDA config files

Entry  Thu Jan 9 14:47:21 2014, Thomas Bergauer, common, position of DESY Table, , , , , Unknown 

BEAM mode:

  • height (z): -346 (initially: -357)
  • horizontal (x): -255 

OFF BEAM mode (Parkposition):

  • height (z): +37
  • horizontal (x): -255 

 

Entry  Fri Jan 10 11:02:31 2014, Markus Friedl, Belle SVD, Power supply, , , 10.01.2014 11:00:00, , Unknown KenWood100114.png
 
Entry  Mon Jan 13 12:02:40 2014, Markus Friedl, common, Kontakt, , , , , Unknown 

Richard Thalmeier   Tel. 4801

Hao Yin  

Entry  Sun Jan 19 18:01:46 2014, Christian Irmler, common, AIDA setup operated with TuxDAQ, , , , , Unknown 

New SIS driver version sis1100-2.13-3 installed on DAQPC. 

To install the driver call as root:

cd /lib/modules/2.6.18-371.3.1.el5/extra

/sbin/modprobe sis1100

Check if /dev/sis* are created.

Managed to run the AIDA setup with old TuxDAQ version from T. Obermayer.

Will now try to install a newer version, which also supports ADC delay scan and internal calibration.

Entry  Fri Jan 24 00:21:16 2014, Hao Yin, , AIDA, HW_AIDA001, 40k, 24.02.2014 00:18, , Unknown 

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ...

Entry  Fri Jan 24 11:03:14 2014, Wolfgang Treberspurg, AIDA, AIDA, HW_AIDA002, 0, 24.01.2014 10:02, , Crap 

TuxDaq crashed

Entry  Fri Jan 24 18:02:46 2014, Wolfgang Treberspurg, Infineon, New Infineon Stack, , , , , Good 

Exchanged AIDA stack with modified Infineon Stack

Configuration:

Beam   Infineon_TB_2014_Baby1(P0)   ---   Inifineon_TB_2014_Baby2(P1) |||  Infineon_TB_2012_Baby2(P2)  --- Infineon_TB_2012_Baby1(P3) ||| Infineon_TB_2012_Strixel_Top-left(N0)  --- Infineon_TB_2012_Strixel_Bottom-right(N1) ---

Entry  Sat Jan 4 16:30:46 2014, Markus Friedl, Infineon, cal, cal001, 83800, 04.01.2014 16:16:51, 04.01.2014 16:25:46, Good 

HV=300V  I=9.3uA  (total)

Entry  Sun Jan 5 15:08:09 2014, Markus Friedl, AIDA, cal, cal002, 83800, 05.01.2014 15:01:32, 05.01.2014 15:30:36, Good 

HV=100V  I=6uA

Entry  Mon Jan 6 16:33:13 2014, Markus Friedl, Infineon, run, run001, 200k, 06.01.2014 16:28:58, 06.01.2014 17:10:56, Good 

HV=300V  I=11.1uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 17:17:47 2014, Markus Friedl, Infineon, run, run002, 200k, 06.01.2014 17:14:39, 06.01.2014 18:00:34, Good 

HV=100V  I=8.5uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 18:06:16 2014, Markus Friedl, Infineon, run, run003, 200k, 06.01.2014 18:04:14, 06.01.2014 18:44:15, Good 

HV=200V  I=9.3uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 18:49:00 2014, Markus Friedl, Infineon, run, run004, 200k, 06.01.2014 18:47:38, 06.01.2014 19:27:33, Good 

HV=250V  I=9.5uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 19:31:44 2014, Markus Friedl, AIDA, run, run005, 200k, 06.01.2014 19:29:52, 06.01.2014 20:09:59, Good 

HV=230V  I=9.9uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 20:14:21 2014, Markus Friedl, Infineon, run, run006, 200k, 06.01.2014 20:12:20, 06.01.2014 20:54:34, Good 

HV=240V  I=9.4uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

ELOG V3.1.5-fc6679b