Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi), Page 3 of 7  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Apr 14 00:40:23 2017, Johannes Grossmann, MaPSA, Teleskope Correlation, 51, 50000, 0, No, Unknown 
Telescope 1294

Threshold 90 

Mapsa CLK Delay 24 ns
Entry  Fri Apr 14 01:33:35 2017, Johannes Grossmann, MaPSA, Teleskope Correlation, 52, 250000, 0, No, Unknown 
Telescope 1296

Threshold 90 

Mapsa CLK Delay 0 
Entry  Fri Apr 14 12:26:00 2017, Johannes Grossmann, MaPSA, Alignment Check, 60, 250000, 0, No, Unknown 
Telescope 1312

Threshold 80

Mapsa CLK Delay 0
Entry  Fri Apr 14 12:48:44 2017, Johannes Grossmann, MaPSA, Alignment Check, 61, 250000, 0, No, Unknown 
Telescope 1314

Threshold 80

Mapsa CLK Delay 0
Entry  Fri Apr 14 12:58:08 2017, Johannes Grossmann, MaPSA, Alignment Check, 64, 250000, 0, No, Unknown 
Telescope 1316

Threshold 80

Mapsa CLK Delay 0
Entry  Fri Apr 14 13:21:07 2017, Johannes Grossmann, MaPSA, Alignment Check, 66, 250000, 0, No, Unknown 
Telescope 1318

Threshold 100

Mapsa CLK Delay 0
Entry  Sun Apr 16 22:42:51 2017, Johannes Grossmann, MaPSA, HV_Scan, 387, 0, 0, No, Unknown 
Changed HV from 100V to 80 V

22:41 16.4.2017
Entry  Mon Apr 17 10:10:33 2017, Johannes Grossmann, MaPSA, HV_Scan, 387, 0, 0, No, Unknown 
Changed HV from 80 V to 60 V

Not in condition data applied in the settings

10:08 17.4.2017 
Entry  Mon Apr 17 12:26:33 2017, Johannes Grossmann, MaPSA, HV_Scan, 456, 0, 0, No, Unknown 
Changed HV from 60 V to 120 V

12:24 17.4.2017 
Entry  Mon Apr 17 17:55:55 2017, Johannes Grossmann, MaPSA, HV_Scan, 488, 0, 0, No, Unknown 
Changed HV from 120 V to 90 V

17:53 17.4.2017
Entry  Mon Apr 17 23:50:59 2017, Johannes Grossmann, MaPSA, HV_Scan, 522, 0, 0, No, Unknown 
Changed HV from 90 V to 80 V

Kann ich wegwerfen!

23:49 17.4.2017
Entry  Mon Apr 17 23:52:47 2017, Johannes Grossmann, MaPSA, HV_Scan, 523, 0, 0, No, Unknown 
Changed HV 80 V

23:50 17.4.2017
Entry  Tue Apr 18 16:16:59 2017, Johannes Grossmann, MaPSA, Std Settings, 604, 0, 0, No, Unknown 
Changed HV 100 V Threshold 75

16:14 17.4.2017

Telescope Runnumber 1855
Entry  Tue Apr 18 21:55:44 2017, Johannes Grossmann, MaPSA, Rotation, 635, 0, 0, No, Unknown 
HV 100 V Threshold 75 Winkel 15

16:14 17.4.2017

Telescope Runnumber 1887
Entry  Thu Apr 20 10:07:30 2017, Johannes Grossmann, MaPSA, Rotation, 635, 0, 0, No, Unknown 
HV 100 V Threshold 75 Winkel 25

16:14 17.4.2017

Telescope Runnumber 1887
Entry  Wed Apr 12 21:06:44 2017, Axel König, ALiBaVa (IFX), run_001_IFX_CB_100V.dat, 001, 200000, 109, 4.5, 240, No, Unknown 11.png46.png
First run for alibava modules with Sensor IFX_CB.

Beam energy = 5.6 GeV

Telescope threshold = 6
Entry  Wed Apr 12 22:34:18 2017, Axel König, ALiBaVa (IFX), run_002_IFX_CB_100V.dat, 002, 100000, 109, 0.5, 240, No, Unknown 
Remarks: Beam position on only one chip.




Parameter
Value


Alibava run
Entry  Wed Apr 12 22:41:08 2017, Axel König, ALiBaVa (IFX), run_003_IFX_CB_100V.dat, 003, 100000, 109, 8.5, 240, No, Unknown 
Remarks: Beam position on only one chip.




Parameter
Value


Alibava run
run_003_IFX_CB_100V.dat


Entry  Thu Apr 13 09:23:20 2017, Axel König, ALiBaVa (IFX), run_005_IFX_CB_10V.dat, 005, 285000, 109, 4.5, 240, No, Unknown 
Remarks: Telescope run 508. Bias scan 10 V.




Parameter
Value


Alibava run
run_005_IFX_CB_10V.dat


Entry  Thu Apr 13 10:03:29 2017, Axel König, ALiBaVa (IFX), run_001_IFX_CB_100V.dat, 001, 200000, 109, 4.5, 240, No, Unknown 
Remarks: Telescope run 496. Bias voltage 100 V. First run at DESY TB.




Parameter
Value


Alibava run
run_001_IFX_CB_100V.dat


ELOG V3.1.5-fc6679b