Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 4     Entry time: Wed Apr 12 22:34:18 2017
Author: Axel König 
Project: ALiBaVa (IFX) 
Subject: run_002_IFX_CB_100V.dat 
Run Number: 002 
Events: 100000 
XYPosition: 109, 0.5, 240 
Cooling: No 
Data: Unknown 

Remarks: Beam position on only one chip.

Parameter Value
Alibava run run_002_IFX_CB_100V.dat
Telescope run 498
triggers 100000
Alibava trigger eff. ?
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100 V
Latency 132
Table x 109 mm
Table z 0.5 mm
Table rot 240 deg (parallel to tele. planes)
ELOG V3.1.5-fc6679b