Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi), Page 7 of 7  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsup XYPosition Cooling Data
  44   Thu Apr 13 22:41:52 2017 Johannes GrossmannMaPSATeleskope Correlation38500000NoUnknown

Telescope 1272

Threshold 90 

Mapsa CLK Delay 6 ns

Reference Plane out of sync

  45   Thu Apr 13 22:52:18 2017 Johannes GrossmannMaPSATeleskope Correlation39500000NoUnknown

Telescope 1274

Threshold 90 

Mapsa CLK Delay 6 ns

  46   Thu Apr 13 22:59:32 2017 Johannes GrossmannMaPSATeleskope Correlation40500000NoUnknown

Telescope 1276

Threshold 90 

Mapsa CLK Delay 8 ns

Reference out of sync

  47   Thu Apr 13 23:09:37 2017 Johannes GrossmannMaPSATeleskope Correlation42500000NoUnknown

Telescope 1278

Threshold 90 

Mapsa CLK Delay 8 ns

  48   Thu Apr 13 23:20:07 2017 Johannes GrossmannMaPSATeleskope Correlation43500000NoUnknown

Telescope 1278

Threshold 90 

Mapsa CLK Delay 10 ns

Reference out of sync

  49   Thu Apr 13 23:27:01 2017 Johannes GrossmannMaPSATeleskope Correlation44500000NoUnknown

Telescope 1280

Threshold 90 

Mapsa CLK Delay 10 ns

  50   Thu Apr 13 23:30:39 2017 Johannes GrossmannMaPSATeleskope Correlation45500000NoUnknown

Telescope 1282

Threshold 90 

Mapsa CLK Delay 12 ns

  51   Thu Apr 13 23:40:26 2017 Johannes GrossmannMaPSATeleskope Correlation46500000NoUnknown

Telescope 1284

Threshold 90 

Mapsa CLK Delay 14 ns

  52   Thu Apr 13 23:50:36 2017 Johannes GrossmannMaPSATeleskope Correlation47500000NoUnknown

Telescope 1286

Threshold 90 

Mapsa CLK Delay 16 ns

  53   Fri Apr 14 00:01:03 2017 Johannes GrossmannMaPSATeleskope Correlation48500000NoUnknown

Telescope 1288

Threshold 90 

Mapsa CLK Delay 18 ns

  54   Fri Apr 14 00:12:05 2017 Johannes GrossmannMaPSATeleskope Correlation48500000NoUnknown

Telescope 1288

Threshold 90 

Mapsa CLK Delay 20 ns

  55   Fri Apr 14 00:12:53 2017 Johannes GrossmannMaPSATeleskope Correlation49500000NoUnknown

Telescope 1292

Threshold 90 

Mapsa CLK Delay 20 ns

  56   Fri Apr 14 00:22:30 2017 Johannes GrossmannMaPSATeleskope Correlation50500000NoUnknown

Telescope 1292

Threshold 90 

Mapsa CLK Delay 22 ns

  57   Fri Apr 14 00:40:23 2017 Johannes GrossmannMaPSATeleskope Correlation51500000NoUnknown

Telescope 1294

Threshold 90 

Mapsa CLK Delay 24 ns

  65   Fri Apr 14 13:06:30 2017 Axel KoenigALiBaVa (IFX)run_022_IFX_CB_100V.dat022500000109, 10.5, 240NoUnknown

Remarks: Telescope run 545. Bias voltage 100 V. Beam position on only one chip.

Parameter Value
Alibava run run_022_IFX_CB_100V.dat
Telescope run 545
Triggers 500000
Alibava trigger eff ~62 %
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100 V
Latency 132
Table x 109 mm
table z 10.5 mm
table rot 240 deg (parallel to tele. planes)
  136   Thu Apr 20 10:29:10 2017 Axel KoenigALiBaVa (IFX)run_009_Irrad_600V.dat00960000096, 64, 360NoUnknown

Remarks: Telescope run 639. Bias scan -600V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing!

Telescope chiller turned on (15 deg).

Parameter Value
Alibava run run_009_Irrad_600V.dat
Telescope run 639
Triggers 600000
Alibava trigger eff. ~70%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -600
Latency 132
Table x 96 mm
Table z 64 mm
Tabe rot

360 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 43.4 uA
  124   Tue Apr 18 18:48:27 2017 Axel KoenigALiBaVa (IFX)run_002_double_irrad_100V.dat00270000094, 1, 240NoUnknown

Remarks: Telescope run 623. 1nd chip only. Central position.

Telescope chiller turned on!

Parameter Value
Alibava run run_002_double_irrad_100V.dat
Telescope run 623
Triggers 700000
Alibava trigger eff. ~62%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 94 mm
Table z 1 mm
Tabe rot

240 deg

  32   Thu Apr 13 18:26:57 2017 Axel KoenigALiBaVa (IFX)run_016_IFX_CB_100V.dat016750000109, 4.5, 240NoCrap

3Remarks: Telescope run 527-531. Bias scan 100 V. Telescope got out of sync. Match with telescope data only up to 175000 events.

Parameter Value
Alibava run run_016_IFX_CB_100V.dat
Telescope run 527-531
Triggers 750000
Alibava trigger eff. ~60%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 109 mm
Table z 4.5 mm
Tabe rot

240 deg (parallel to tele. planes)

  140   Thu Apr 20 16:05:14 2017 Axel KoenigALiBaVa (IFX)run_013_Irrad_500V.dat01375000096, 54, 360NoUnknown

Remarks: Telescope run 643. Bias voltage -500V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing!

Positoj scan vertical.

Telescope chiller turned on (15 deg).

Parameter Value
Alibava run run_013_Irrad_500V.dat
Telescope run 643
Triggers 750000
Alibava trigger eff. ~70%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -500
Latency 132
Table x 96 mm
Table z 54 mm
Tabe rot

360 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 39.2 uA
  94   Mon Apr 17 09:04:02 2017 Axel KoenigALiBaVa (IFX)run_006_Baby_100V.dat006k.a.102.5, 22.5, 230NoUnknown

Remarks: Telescope run 570. Telescope chiller turned off (could be the root cause of runs crashing).

Forgot ro record data in elog.

Parameter Value
Alibava run run_006_Baby_100V.dat
Telescope run 570
Triggers k.a.
Alibava trigger eff. ~93%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 102.5 mm
Table z 22.5 mm
Tabe rot

230 deg

ELOG V3.1.5-fc6679b