Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Testbeam at DESY in October 2024  Not logged in ELOG logo
Message ID: 325     Entry time: Fri Oct 4 12:25:11 2024
Author: tb-crew 
Subject: centering DUT 
Run Number: 291 
DUT: L W3-3E14 
Biasing: Backside 
Beam Energy: 4.2 
thr: 1.1 
HV: -190 
scan-val:  
Data: Unknown 
t-Start: 04.10.2024 12:24:00 
t-Stop: 04.10.2024 12:25:38 
Duration_min:
automatic log for run 291
Comment:
currently at
positionX = 55.5
positionY = 12
Attachment 1: peary_config.cfg  1 kB  | Show | Show all
Attachment 2: matrix_mpw4_base.txt  274 Bytes  | Show | Show all
Attachment 3: mpw4.conf  3 kB  | Show | Show all
ELOG V3.1.5-fc6679b