Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Testbeam at DESY in October 2024  Not logged in ELOG logo
stop Entry is currently edited by Bernhard Pilsl on 192.76.172.198.
You can "steal" the lock by editing this entry.
You might however then overwrite each other's modifications.
Message ID: 321     Entry time: Fri Oct 4 12:02:37 2024
Author: tb-crew 
Subject: centering DUT 
Run Number:  
DUT: L W3-3E14 
Biasing: Backside 
Beam Energy: 4.2 
thr:  
HV:  
scan-val:  
Data: Unknown 
t-Start:  
t-Stop:  
Duration_min:  
currently at
positionX = 54.5
positionY = 11
ELOG V3.1.5-fc6679b