Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 6 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events XYPositiondown Cooling Data Text Attachments
  87   Thu Jun 11 11:42:39 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration012  YesGoodcooled
until about 400k after that room temp
pedestalrun 009
  
  94   Fri Jun 12 09:31:58 2015 Hao YinBelle II FADC (H6A)FIR005  YesGoodFIR filer and ADC delay for long sixlet
cal run.
  
  95   Fri Jun 12 16:52:52 2015 Benedikt WürknerSVD3 (H6B)Telescope without DUT76~30k NoGoodThreshold 6

Testrun to see how the telescope
behaves without a DUT to test if there is
 Telescope_without_DUT.png 
  96   Fri Jun 12 17:00:18 2015 Hao YinBelle II FADC (H6A)Pedestal01110000 NoGoodcooled pedestal vaules for long sixlet
cal
  
  97   Fri Jun 12 17:03:02 2015 Hao YinBelle II FADC (H6A)Pedestal01210000 NoGoodroom temp
FIRRun002
 
  
  98   Fri Jun 12 17:08:23 2015 Benedikt WürknerSVD3 (H6B)Telescope with FEI480~30k NoGoodThreshold 6

Testrun to see how the telescope
behaves without a DUT to test if there is
  
  103   Sat Jun 13 16:47:28 2015 Benedikt WürknerSVD3 (H6B)Mimosa threshold with FEI48212000 NoGoodSet mimosa threshold to 5 and recorded
with FEI4 upstream

L3 already in sensor but not yet
  
ELOG V3.1.5-fc6679b