Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 6 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsdown XYPosition Cooling Data
  90   Thu Jun 11 16:38:17 2015 Hao YinBelle II FADC (H6A)Hardware023 7YesGood

temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: CE, pos 7

  92   Thu Jun 11 18:01:54 2015 Hao YinBelle II FADC (H6A)Hardware024 6YesGood

temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: -z, pos 6

  93   Thu Jun 11 18:37:11 2015 Hao YinBelle II FADC (H6A)Hardware025 6YesGood

temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: ce, pos 3

  94   Fri Jun 12 09:31:58 2015 Hao YinBelle II FADC (H6A)FIR005  YesGood

FIR filer and ADC delay for long sixlet cal run.

  102   Sat Jun 13 13:01:39 2015 Hao YinBelle II FADC (H6A)Hardware029 3NoGood

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

L3 rotated.
taget: CE, pos 3
 

  107   Sat Jun 13 19:26:26 2015 Hao YinBelle II FADC (H6A)Hardware030 3NoGood

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

wo L3 and L4
taget: CE, pos 3
 

  108   Sat Jun 13 19:29:50 2015 Hao YinBelle II FADC (H6A)Hardware030 1NoGood

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

wo L3 and L4
taget: bw, pos 1
 

ELOG V3.1.5-fc6679b