Fri Jun 5 19:55:00 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 003, , , , Unknown
|
lat = 98
room temp
pedestalrun 003 |
Fri Jun 5 19:59:44 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 004, 10000, , , Good
|
update pedestal values for room temp sixlet runs.
|
Fri Jun 5 23:38:51 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 005, 10000, , , Unknown
|
Readjust after cooling box.
room temp, firrun002
|
Sat Jun 6 16:14:36 2015, Benedikt Würkner, SVD3 (H6B), calibration run and setup information, cal01, , , , Unknown
|
Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)
|
Sat Jun 6 16:17:52 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw002, 5000, , , Good
|
Table: 100:70
Bias: +-50V
Run to confirm trigger delay |
Sat Jun 6 16:18:48 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw003, 50000, , , Unknown
|
Table: 100:70
Bias: +-50V
Run to confirm trigger delay |
Sat Jun 6 21:00:15 2015, Benedikt Würkner, SVD3 (H6B), first hardware run with TLU and Telescope, hw004, 117171, , , Unknown
|
Table: 100:70
Bias: +-50V
600 pedestal
0 offset (at the beginning)
Started APVDAQ and waited till 600 were taken then started EUDAQ
EUDAQ Run 21
Mimosa Thresholds lvl 6 |
Sat Jun 6 23:30:29 2015, Benedikt Würkner, Belle II FADC (H6A), Hardware, 009, , , , Good
|
room temp, FIRRun002, PedestalRun005, room temp
target: FW, pos 9 (p-0, n-128*4) |
Sun Jun 7 00:58:33 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw006, , , , Crap
|
Table: 100:70
Bias: +-50V
600 pedestal
0 offset (at the beginning)
Started APVDAQ and waited till 600 were taken then started EUDAQ
EUDAQ Run 24
Mimosa Thresholds lvl 7 |
Sun Jun 7 10:36:38 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 006, 10000, , , Unknown
|
Cooled, Temp see attachment
FirRun002
|
Sun Jun 7 10:39:56 2015, Hao Yin, Belle II FADC (H6A), Calibration, 002, , , , Good
|
Cooled!
FIRRun002, pedestalrun006; temp see attachment in pedestalrun006
|
Sun Jun 7 11:38:04 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw007, 15000, , , Good
|
TLU Run 46
Threshold 8b
Offset 601 |
Sun Jun 7 12:10:24 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold8b test run , 0046, 14399, , , Unknown
|
Telescope in combination with SVD3 |
Sun Jun 7 12:11:42 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold7 test run , 0047, 38175, , , Unknown
|
Telescope alone |
Sun Jun 7 12:12:00 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold7 test run , 0048, 53356, , , Unknown
|
Telescope alone |
Sun Jun 7 13:19:19 2015, Hao Yin, Belle II FADC (H6A), Hardware, 010, , , , Good
|
cooled
FIRRun002, PedestalRun006 (temp enty)
target: BW, pos 1 |
Sun Jun 7 13:21:15 2015, Hao Yin, Belle II FADC (H6A), Hardware, 011, 50000, , , Good
|
cooled (see attachment)
FIRRun002, PedestalRun006
target: -Z, pos 2 |
Sun Jun 7 14:44:29 2015, Thomas Bergauer, SVD3 (H6B), XY Stage and DUT Positions, , , , , Unknown
|
Coordinate system:
pos x-Direction = Jura side
pos y-Direction = Down
Zero-point is in the top right corner in Beam direction
absolute Position of PI Stages:
Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )
Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)
Pos 3: x=38.6 mm, y=84 mm
Pos 4: x=130.7 mm, y=84 mm
Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)
Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)
Pos 7: x= 30.5 mm, y= 79 mm (wide side center)
Pos 8: x=136.08 mm, y= 79 mm (narrow side center)
Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)
Pos 10: x= 136.08mm, y=68.9 mm (narrow side down) |
Sun Jun 7 15:59:05 2015, Hao Yin, Belle II FADC (H6A), Hardware, 012, 50000, , , Unknown
|
cooled (see attachment)
FIRRun002, PedestalRun006
target: CE, pos 2
cooling box emergency break ... ie about the last 1-10 k not useable. |
Sun Jun 7 20:02:40 2015, Hao Yin, Belle II FADC (H6A), Cooling Box Emergency break, , , , , Unknown
|
Something triggered a emergency break. HWRun012 only last 1-10k event has to be discarded. |
|