Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015  Not logged in ELOG logo
Message ID: 36     Entry time: Sun Jun 7 14:44:29 2015
Author: Thomas Bergauer 
Project: SVD3 (H6B) 
Subject: XY Stage and DUT Positions 
Run Number:  
Events:  
XYPosition:  
Cooling:  
Data: Unknown 

Coordinate system:

pos x-Direction = Jura side

pos y-Direction = Down

Zero-point is in the top right corner in Beam direction

 

absolute Position of PI Stages:

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Pos 3: x=38.6 mm, y=84 mm

Pos 4: x=130.7 mm, y=84 mm

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)

Pos 7: x= 30.5 mm, y= 79 mm (wide side center)

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

Attachment 1: FWD-BWD.PNG  179 kB  Uploaded Sun Jun 7 16:28:26 2015  | Hide | Hide all | Show all
FWD-BWD.PNG
Attachment 2: apv-numbering.jpg  2.406 MB  Uploaded Mon Jun 8 13:07:01 2015  | Show | Hide all | Show all
Attachment 3: FWD-BWD_Bemaßung.PNG  150 kB  Uploaded Mon Jun 8 17:30:22 2015  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b