Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 2 of 4  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTimedown EndTime Data
  58   Wed Oct 24 09:51:41 2012 Thomas BergauerMicronOrigami_grosscalcal0288380024.10.2012 09:50:5324.10.2012 10:39:43Unknown

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
  57   Wed Oct 24 08:25:04 2012 Thomas BergauerMicronOrigami_grosscalcal0278380024.10.2012 08:22:2524.10.2012 09:10:19Unknown

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
  56   Tue Oct 23 23:12:03 2012 Thomas BergauerMicronOrigami_grossrunrun02722084723.10.2012 23:10:1424.10.2012 08:19:51Unknown

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 
SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.
  55   Tue Oct 23 16:06:09 2012 Markus FriedlMicronOrigami_grossrunrun02610212423.10.2012 16:04:4723.10.2012 23:04:56Unknown

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.

  54   Tue Oct 23 15:55:58 2012 Markus FriedlMicronOrigami_grosscalcal0268380023.10.2012 14:56:4723.10.2012 15:42:17 Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  53   Tue Oct 23 13:50:44 2012 Markus FriedlMicronOrigami_grosscalcal0258380023.10.2012 13:47:09 23.10.2012 14:35:05Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=48uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  52   Tue Oct 23 08:22:42 2012 Markus FriedlMicronOrigami_grossrunrun02510000023.10.2012 08:21:3723.10.2012 13:47:09Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=47uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  51   Mon Oct 22 19:19:53 2012 Markus FriedlMicronOrigami_grossrunrun02426000022.10.2012 19:18:1623.10.2012 08:17:20 Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=57uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

Beam shape on n side (horizontally) different than in previous runs. Number of triggers per spill is reduced to ~60k (was 200..250k before). Reason unknown.

  50   Mon Oct 22 10:10:16 2012 Markus FriedlMicronOrigami_grosscalcal0248380022.10.2012 10:08:5322.10.2012 10:54:18Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=53uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  49   Mon Oct 22 00:57:05 2012 Markus FriedlMicronOrigami_grossrunrun02317662922.10.2012 00:55:5922.10.2012 10:04:38Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

No more events since 22.10.2012  07:09:53  event=176629 - spill signals removed?

 

  48   Mon Oct 22 00:08:39 2012 Markus FriedlMicronOrigami_grosscalcal0238380022.10.2012 00:07:3422.10.2012 00:53:02Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  47   Sun Oct 21 16:04:06 2012 Markus FriedlMicronOrigami_grossrunrun02215128221.10.2012 18:16:5322.10.2012 00:04:42Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  46   Sun Oct 21 15:15:45 2012 Markus FriedlMicronOrigami_grosscalcal0228380021.10.2012 15:13:4721.10.2012 16:00:25Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  45   Sun Oct 21 10:39:15 2012 Markus FriedlMicronOrigami_grossrunrun02110000021.10.2012 10:37:2621.10.2012 15:04:49Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

  44   Sun Oct 21 09:50:00 2012 Markus FriedlMicronOrigami_grosscalcal0218380021.10.2012 09:50:07 21.10.2012 10:35:40Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  43   Sun Oct 21 09:01:04 2012 Markus FriedlMicronOrigami_grosscalcal0208380021.10.2012 08:59:2121.10.2012 09:45:03Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=72uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

  42   Sat Oct 20 19:35:30 2012 Markus FriedlMicronOrigami_grossrunrun02030000020.10.2012 19:34:1921.10.2012 08:55:28Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=73A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

  41   Sat Oct 20 11:40:13 2012 Markus FriedlMicronOrigami_grossrunrun01910000020.10.2012 11:38:1920.10.2012 19:20:51Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=72A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Several periods without beam during this run.

  40   Sat Oct 20 10:49:03 2012 Markus FriedlMicronOrigami_grosscalcal0198380020.10.2012 10:46:3620.10.2012 11:32:57Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=70A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

no beam at beginning (LINAC problem)

  39   Fri Oct 19 19:25:29 2012 Markus FriedlMicronOrigami_grossrunrun01831875619.10.2012 19:23:5520.10.2012 10:27:11Good

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

beam went off (LINAC problem) around

20.10.2012  07:00:39  event=315937

So better ignore the last 3000 events during analysis.

ELOG V3.1.5-fc6679b