Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 2 of 4  Not logged in ELOG logo
Entry  Sat Oct 27 00:43:55 2012, Christian Irmler, MicronBaby, cal, cal029, 83800, 27.10.2012 00:10:15, 27.10.2012 00:36:55, Good 

After irradiation

 

Micron baby stack after gamma irrdiation
HV = -100 V
I = -58 uA

Entry  Wed Oct 24 17:24:40 2012, Thomas Bergauer, MicronOrigami_gross, run ohne Strom ;-(, run028, , , , Unknown 

 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-2.5V, Ibias=14.5uA

Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29

= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3

= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

NO DATATAKING BECAUSE OF POWER FAILURE AT NIM CRATE (counter finster, warum?). Georg schaut sich das an, sobald in der zone access ist.

Auch AnnekathrinPC ist nicht erreichbar. 

 

Entry  Wed Oct 24 09:51:41 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal028, 83800, 24.10.2012 09:50:53, 24.10.2012 10:39:43, Unknown 

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Wed Oct 24 08:25:04 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal027, 83800, 24.10.2012 08:22:25, 24.10.2012 09:10:19, Unknown 

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Tue Oct 23 23:12:03 2012, Thomas Bergauer, MicronOrigami_gross, run, run027, 220847, 23.10.2012 23:10:14, 24.10.2012 08:19:51, Unknown 

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 
SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.
Entry  Tue Oct 23 16:06:09 2012, Markus Friedl, MicronOrigami_gross, run, run026, 102124, 23.10.2012 16:04:47, 23.10.2012 23:04:56, Unknown 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.

Entry  Tue Oct 23 15:55:58 2012, Markus Friedl, MicronOrigami_gross, cal, cal026, 83800, 23.10.2012 14:56:47, 23.10.2012 15:42:17 , Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Tue Oct 23 13:50:44 2012, Markus Friedl, MicronOrigami_gross, cal, cal025, 83800, 23.10.2012 13:47:09 , 23.10.2012 14:35:05, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=48uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Tue Oct 23 08:22:42 2012, Markus Friedl, MicronOrigami_gross, run, run025, 100000, 23.10.2012 08:21:37, 23.10.2012 13:47:09, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=47uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Mon Oct 22 19:19:53 2012, Markus Friedl, MicronOrigami_gross, run, run024, 260000, 22.10.2012 19:18:16, 23.10.2012 08:17:20 , Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=57uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

Beam shape on n side (horizontally) different than in previous runs. Number of triggers per spill is reduced to ~60k (was 200..250k before). Reason unknown.

Entry  Mon Oct 22 10:10:16 2012, Markus Friedl, MicronOrigami_gross, cal, cal024, 83800, 22.10.2012 10:08:53, 22.10.2012 10:54:18, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=53uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Mon Oct 22 00:57:05 2012, Markus Friedl, MicronOrigami_gross, run, run023, 176629, 22.10.2012 00:55:59, 22.10.2012 10:04:38, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

No more events since 22.10.2012  07:09:53  event=176629 - spill signals removed?

 

Entry  Mon Oct 22 00:08:39 2012, Markus Friedl, MicronOrigami_gross, cal, cal023, 83800, 22.10.2012 00:07:34, 22.10.2012 00:53:02, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Sun Oct 21 16:04:06 2012, Markus Friedl, MicronOrigami_gross, run, run022, 151282, 21.10.2012 18:16:53, 22.10.2012 00:04:42, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Sun Oct 21 15:15:45 2012, Markus Friedl, MicronOrigami_gross, cal, cal022, 83800, 21.10.2012 15:13:47, 21.10.2012 16:00:25, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Sun Oct 21 10:39:15 2012, Markus Friedl, MicronOrigami_gross, run, run021, 100000, 21.10.2012 10:37:26, 21.10.2012 15:04:49, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

Entry  Sun Oct 21 09:50:00 2012, Markus Friedl, MicronOrigami_gross, cal, cal021, 83800, 21.10.2012 09:50:07 , 21.10.2012 10:35:40, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Sun Oct 21 09:01:04 2012, Markus Friedl, MicronOrigami_gross, cal, cal020, 83800, 21.10.2012 08:59:21, 21.10.2012 09:45:03, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=72uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Sat Oct 20 19:35:30 2012, Markus Friedl, MicronOrigami_gross, run, run020, 300000, 20.10.2012 19:34:19, 21.10.2012 08:55:28, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=73A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

Entry  Sat Oct 20 11:40:13 2012, Markus Friedl, MicronOrigami_gross, run, run019, 100000, 20.10.2012 11:38:19, 20.10.2012 19:20:51, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=72A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Several periods without beam during this run.

ELOG V3.1.5-fc6679b