Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 66     Entry time: Sun Oct 28 08:37:53 2012
Author: Christian Irmler 
Project: MicronOrigami_gross 
Subject: run 
Run Number: run033 
Events: 66937 
StartTime: 28.10.2012 08:33:42 
EndTime: 28.10.2012 14:10:43  
Data: Unknown 

Belle stack 2 after gamma irradiation

HV = +50V -50V

I = 101 uA

CO2 cooling

hitting APV2 (n side) = center of wedge sensor

 

Temperatur sensors:

  • T11: Origami #4 in
  • T12: Origami #4 out
  • T13: Origami #3 in (still wrong values!)
  • T14: Origami #3 out
  • T15: Wedge new 1 out
  • T16: Wedge old out
  • T17: Wedge new 1 cooling block
  • T18: Wedge old cooling block
Attachment 1: temp_run33.JPG  29 kB  | Show | Show all
Attachment 2: temp_run33_2.JPG  147 kB  | Show | Show all
ELOG V3.1.5-fc6679b