Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 2     Entry time: Fri Oct 12 19:42:36 2012
Author: Christian Irmler 
Project: MicronBaby 
Subject: Configuration of normal stack 
Run Number:  
Events:  
StartTime:  
EndTime:  
Data: Unknown 

Micron baby stack with all strips connected to APV chips

n-side faces the beam, p-side not read out.

Channels counting from bottom to top

Modules as seen by the beam:

Module name                      z-position [mm]                        Sensor ID
COMM-1                               0.0                                               B2Micron_2965_10_baby2
COMM-2                               24.7                                             B2Micron_2965_14_baby2
SPRAY-1                              49.4                                             B2Micron_2825_05_baby3
SPRAY-2                              75.5                                             B2Micron_2825_05_baby4
COMB-1                               100.9                                           B2Micron_2965_10_baby4
COMB-2                               135.0                                           B2Micron_2965_14_baby4
ATOLL-1                              159.0                                           B2Micron_2965_14_baby3
ATOLL-2                              183.7                                           B2Micron_2965_17_baby3

Attachment 1: micronbaby_stack_geometry.jpg  197 kB  | Hide | Hide all
micronbaby_stack_geometry.jpg
ELOG V3.1.5-fc6679b