Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 5 of 5  Not logged in ELOG logo
Entry  Sun Oct 9 11:28:30 2011, Manfred Valentan, HPK, HPK BSTD stack configuration, , , , , Unknown IMG_5058.JPGIMG_5069.JPG

Module order:

BSTD1-N
BSTD2-N

BADD1-N (for z information)

BSTD1-P
BSTD1-Y

BSTD2-P
BSTD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Entry  Sun Oct 9 11:31:43 2011, Manfred Valentan, HPK, HPK BADD stack configuration, , , , , Unknown IMG_5097.JPG

Module order:

BADD1-N
BADD2-N

BSTD1-N (for z information)

BADD1-P
BADD1-Y

BADD2-P
BADD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Entry  Mon Oct 10 12:16:06 2011, Marko Dragicevic, common, Beam Profile and Magnet BeamRef Settings , , , , , Unknown BeamProfile.pngMagentBeamRefs.png

Beam Profile from H6A, 10.10.2011 11:40

BeamRef settings for all magnets, File H6B.702

Entry  Mon Oct 10 12:32:42 2011, Manfred Valentan, CNM, CNM stack configuration, , , , , Unknown IMG_5102.JPGIMG_5092.JPG

Module order:

CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information)
CNM-V2 (works fine)
 

Attatchment 1: Stack config, beam from right. In the box the stack is mounted with the labelled side of the BSTD1-N module on top (90deg rotated w.r.t. photo)

Attachment 2: the top edges of the sensors coincide -> when the beam hits the last strips of the BSTD, it also hits the pitch adapter region of the CNM sensors

Entry  Thu Oct 13 13:08:38 2011, Thomas Bergauer, common, end of success, , , , , Unknown 
 
Entry  Thu Oct 20 11:49:14 2011, Markus Friedl, common, Scintillator dimensions, , , , , Good bhihagag.jpgbdgaegba.jpg
 
Entry  Mon Mar 5 17:34:43 2012, Christian Irmler, BELLE, Origami Module #4, run108, 100k, , 05.03.2012 16:24:12, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

ELOG V3.1.5-fc6679b