Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 2 of 5  Not logged in ELOG logo
Entry  Mon Sep 19 17:42:01 2011, Manfred Valentan, Micron, Module SPRAY-1, , , , ,  

Sensor: B2Micron_2825_05_Baby3

p-stop: p-spray WITHOUT intermediate strips

Hybrid p-side: H32 (reused from last year)
Hybrid n-side: MB8

Entry  Mon Sep 19 17:42:39 2011, Manfred Valentan, Micron, Module SPRAY-I-1, , , , ,  

Sensor: B2Micron_2825_15_Baby2

p-stop: p-spray WITH intermediate strips

Hybrid p-side: MB1
Hybrid n-side: MB9

Entry  Mon Sep 19 17:44:00 2011, Manfred Valentan, Micron, Module COMM-1, , , , ,  

Sensor: B2Micron_2826_19_Baby2 (reused from last year, was TRK7)

p-stop: Common, with intermediate strips

Hybrid p-side: H46
Hybrid n-side: M37

Entry  Mon Sep 19 17:44:39 2011, Manfred Valentan, Micron, Module COMB-1, , , , ,  

Sensor: B2Micron_2826_01_Baby4 (reused from last year, was TRK6)

p-stop: Combined, with intermediate strips

Hybrid p-side: H45
Hybrid n-side: M36

Entry  Mon Sep 19 17:46:07 2011, Manfred Valentan, Micron, Module ATOLL-1, , , , ,  

Sensor: B2Micron_2826_07_Baby3 (reused from last year, but was not used in beam test SPS2010)

p-stop: Atoll, with intermediate strips

Hybrid p-side: H40
Hybrid n-side: M30

Entry  Mon Sep 19 17:47:11 2011, Manfred Valentan, Micron, Module COMB-IRRAD, , , , ,  

Sensor: B2Micron_2826_19_Baby4 (reused from last year, was DUT4, module is irradiated to 700 kGy)

p-stop: Combined, with intermediate strips, irradiated

Hybrid p-side: H48
Hybrid n-side: M35

Entry  Mon Sep 19 17:47:50 2011, Manfred Valentan, Micron, Module COMM-IRRAD, , , , ,  

Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)

p-stop: Common, with intermediate strips, irradiated

Hybrid p-side: H41
Hybrid n-side: M31

Entry  Mon Oct 3 21:01:00 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones n & h-n, run001, 200k, 03.10.2011 20:54:22, 03.10.2011 23:25:47, Good 

hit modules in top right corner -> Zones narrow and half-narrow for all modules

Position of HEPHY x-z-table:
x = 324
z = 103

Entry  Mon Oct 3 21:08:27 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, configuration, , , , ,  Micron-Baby-Stack_p-stop.pngcern11_micronbaby_pstop_single.cfgcern11_micronbaby_pstop_multi6.cfg

Photo of hand-drawn stack configuration, config files

Entry  Tue Oct 4 00:11:31 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones w & h-w, run002, 760000, 04.10.2011 00:11:06, 04.10.2011 09:01:06, Good 

hit modules in bottom left corner -> Zones wide and half-wide for all modules

Position of HEPHY x-z-table:
x = 336
z = 89

Entry  Tue Oct 4 10:47:59 2011, Manfred Valentan, Micron, Internal Calibration, cal001, 83800, 03.10.2011 20:34:48, 03.10.2011 20:50:57,  

micronbaby p-stop stack
HV = -100V
beam on

Entry  Tue Oct 4 15:16:06 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom left, run003, 200k, 04.10.2011 11:29:19, 04.10.2011 13:57:54, Good 

hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD

Position of HEPHY x-z-table:
x = 336
z = 89

Entry  Tue Oct 4 15:16:45 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom right NOT USABLE, run004, 200k, 4.10.2011 15:28:48, 04.10.2011 19:36:50, Crap 

HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.

hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD

Position of HEPHY x-z-table:
x = 322
z = 89

Entry  Sun Oct 9 11:28:30 2011, Manfred Valentan, HPK, HPK BSTD stack configuration, , , , , Unknown IMG_5058.JPGIMG_5069.JPG

Module order:

BSTD1-N
BSTD2-N

BADD1-N (for z information)

BSTD1-P
BSTD1-Y

BSTD2-P
BSTD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Entry  Sun Oct 9 11:31:43 2011, Manfred Valentan, HPK, HPK BADD stack configuration, , , , , Unknown IMG_5097.JPG

Module order:

BADD1-N
BADD2-N

BSTD1-N (for z information)

BADD1-P
BADD1-Y

BADD2-P
BADD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Entry  Mon Oct 10 12:15:52 2011, Manfred Valentan, CNM, CNM stack, run024, 110000, 10.10.2011 12:03:58, 10.10.2011 14:05:56, Good 

no cooling
beam on; xy table position x=320.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 28 / 1 uA;  Istart_BSTD= 0.12 uA

Entry  Mon Oct 10 12:32:42 2011, Manfred Valentan, CNM, CNM stack configuration, , , , , Unknown IMG_5102.JPGIMG_5092.JPG

Module order:

CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information)
CNM-V2 (works fine)
 

Attatchment 1: Stack config, beam from right. In the box the stack is mounted with the labelled side of the BSTD1-N module on top (90deg rotated w.r.t. photo)

Attachment 2: the top edges of the sensors coincide -> when the beam hits the last strips of the BSTD, it also hits the pitch adapter region of the CNM sensors

Entry  Sat Oct 8 20:33:58 2011, Karl-Heinz Hoffmann, HPK, baby_std, run019, 150000, 08.10.2011 20:22:45, 08.10.2011 23:19:23, Good 

no cooling
beam on; xy table position x=333  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings

Entry  Sat Oct 8 23:27:44 2011, Karl-Heinz Hoffmann, HPK, baby_std, run020, 382000, 08.10.2011 23:24:16, 09.10.2011 09:24:20, Good 

no cooling
beam on; xy table position x=327,5  y=65
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings

Entry  Sun Oct 9 10:13:11 2011, Karl-Heinz Hoffmann, HPK, baby_add, cal011, 83800, 09.10.2011 10:05:01, , Good 

no cooling
beam on; xy table position x=  y=
HV=200V Istart_P=1.5uA;  Istart_N=0.22uA
std. I2C settings

ELOG V3.1.5-fc6679b