Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 2 of 5  Not logged in ELOG logo
ID Date Authordown Project Subject Run Number Events StartTime EndTime Data
  14   Mon Sep 19 17:42:01 2011 Manfred ValentanMicronModule SPRAY-1     

Sensor: B2Micron_2825_05_Baby3

p-stop: p-spray WITHOUT intermediate strips

Hybrid p-side: H32 (reused from last year)
Hybrid n-side: MB8

  15   Mon Sep 19 17:42:39 2011 Manfred ValentanMicronModule SPRAY-I-1     

Sensor: B2Micron_2825_15_Baby2

p-stop: p-spray WITH intermediate strips

Hybrid p-side: MB1
Hybrid n-side: MB9

  16   Mon Sep 19 17:44:00 2011 Manfred ValentanMicronModule COMM-1     

Sensor: B2Micron_2826_19_Baby2 (reused from last year, was TRK7)

p-stop: Common, with intermediate strips

Hybrid p-side: H46
Hybrid n-side: M37

  17   Mon Sep 19 17:44:39 2011 Manfred ValentanMicronModule COMB-1     

Sensor: B2Micron_2826_01_Baby4 (reused from last year, was TRK6)

p-stop: Combined, with intermediate strips

Hybrid p-side: H45
Hybrid n-side: M36

  18   Mon Sep 19 17:46:07 2011 Manfred ValentanMicronModule ATOLL-1     

Sensor: B2Micron_2826_07_Baby3 (reused from last year, but was not used in beam test SPS2010)

p-stop: Atoll, with intermediate strips

Hybrid p-side: H40
Hybrid n-side: M30

  19   Mon Sep 19 17:47:11 2011 Manfred ValentanMicronModule COMB-IRRAD     

Sensor: B2Micron_2826_19_Baby4 (reused from last year, was DUT4, module is irradiated to 700 kGy)

p-stop: Combined, with intermediate strips, irradiated

Hybrid p-side: H48
Hybrid n-side: M35

  20   Mon Sep 19 17:47:50 2011 Manfred ValentanMicronModule COMM-IRRAD     

Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)

p-stop: Common, with intermediate strips, irradiated

Hybrid p-side: H41
Hybrid n-side: M31

  22   Mon Oct 3 21:01:00 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, zones n & h-nrun001200k03.10.2011 20:54:2203.10.2011 23:25:47Good

hit modules in top right corner -> Zones narrow and half-narrow for all modules

Position of HEPHY x-z-table:
x = 324
z = 103

  23   Mon Oct 3 21:08:27 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, configuration     

Photo of hand-drawn stack configuration, config files

  24   Tue Oct 4 00:11:31 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, zones w & h-wrun00276000004.10.2011 00:11:0604.10.2011 09:01:06Good

hit modules in bottom left corner -> Zones wide and half-wide for all modules

Position of HEPHY x-z-table:
x = 336
z = 89

  27   Tue Oct 4 10:47:59 2011 Manfred ValentanMicronInternal Calibrationcal0018380003.10.2011 20:34:4803.10.2011 20:50:57 

micronbaby p-stop stack
HV = -100V
beam on

  28   Tue Oct 4 15:16:06 2011 Manfred ValentanMicronMicron-Baby-Stack p-spray, run bottom leftrun003200k04.10.2011 11:29:1904.10.2011 13:57:54Good

hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD

Position of HEPHY x-z-table:
x = 336
z = 89

  29   Tue Oct 4 15:16:45 2011 Manfred ValentanMicronMicron-Baby-Stack p-spray, run bottom right NOT USABLErun004200k4.10.2011 15:28:4804.10.2011 19:36:50Crap

HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.

hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD

Position of HEPHY x-z-table:
x = 322
z = 89

  58   Sun Oct 9 11:28:30 2011 Manfred ValentanHPKHPK BSTD stack configuration    Unknown

Module order:

BSTD1-N
BSTD2-N

BADD1-N (for z information)

BSTD1-P
BSTD1-Y

BSTD2-P
BSTD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

  59   Sun Oct 9 11:31:43 2011 Manfred ValentanHPKHPK BADD stack configuration    Unknown

Module order:

BADD1-N
BADD2-N

BSTD1-N (for z information)

BADD1-P
BADD1-Y

BADD2-P
BADD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

  63   Mon Oct 10 12:15:52 2011 Manfred ValentanCNMCNM stackrun02411000010.10.2011 12:03:5810.10.2011 14:05:56Good

no cooling
beam on; xy table position x=320.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 28 / 1 uA;  Istart_BSTD= 0.12 uA

  65   Mon Oct 10 12:32:42 2011 Manfred ValentanCNMCNM stack configuration    Unknown

Module order:

CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information)
CNM-V2 (works fine)
 

Attatchment 1: Stack config, beam from right. In the box the stack is mounted with the labelled side of the BSTD1-N module on top (90deg rotated w.r.t. photo)

Attachment 2: the top edges of the sensors coincide -> when the beam hits the last strips of the BSTD, it also hits the pitch adapter region of the CNM sensors

  53   Sat Oct 8 20:33:58 2011 Karl-Heinz HoffmannHPKbaby_stdrun01915000008.10.2011 20:22:4508.10.2011 23:19:23Good

no cooling
beam on; xy table position x=333  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings

  54   Sat Oct 8 23:27:44 2011 Karl-Heinz HoffmannHPKbaby_stdrun02038200008.10.2011 23:24:1609.10.2011 09:24:20Good

no cooling
beam on; xy table position x=327,5  y=65
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings

  56   Sun Oct 9 10:13:11 2011 Karl-Heinz HoffmannHPKbaby_addcal0118380009.10.2011 10:05:01 Good

no cooling
beam on; xy table position x=  y=
HV=200V Istart_P=1.5uA;  Istart_N=0.22uA
std. I2C settings

ELOG V3.1.5-fc6679b