Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011  Not logged in ELOG logo
Message ID: 65     Entry time: Mon Oct 10 12:32:42 2011
Author: Manfred Valentan 
Project: CNM 
Subject: CNM stack configuration 
Run Number:  
Events:  
StartTime:  
EndTime:  
Data: Unknown 

Module order:

CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information)
CNM-V2 (works fine)
 

Attatchment 1: Stack config, beam from right. In the box the stack is mounted with the labelled side of the BSTD1-N module on top (90deg rotated w.r.t. photo)

Attachment 2: the top edges of the sensors coincide -> when the beam hits the last strips of the BSTD, it also hits the pitch adapter region of the CNM sensors

Attachment 1: IMG_5102.JPG  2.144 MB  | Hide | Hide all | Show all
IMG_5102.JPG
Attachment 2: IMG_5092.JPG  2.017 MB  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b