Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010  Not logged in ELOG logo
Message ID: 64     Entry time: Sun Oct 3 14:35:12 2010
Author: Marko Dragicevic 
Project: CNM 
Subject: cal 
Run Number: cal009 
Events: 83800 
StartTime: 03.10.2010 13:50:54 
EndTime:  

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
DUT outside of beam

calibration started after 1 hour warmup

Attachment 1: cal009_cal_apv6.png  142 kB  Uploaded Sun Oct 3 16:39:14 2010  | Show | Hide all | Show all
Attachment 2: cal009_cal_apv7.png  129 kB  Uploaded Sun Oct 3 16:39:40 2010  | Hide | Hide all | Show all
cal009_cal_apv7.png
Attachment 3: slowcontrol_CNM_cal009.gif  41 kB  Uploaded Sun Oct 3 16:43:47 2010  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b