ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
103
|
Tue Aug 25 20:21:31 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009 20:18:18 | 26.08.2009 01:27:12 | Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
97
|
Tue Aug 25 11:26:23 2009 |
Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009 12:19:55 | Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD |
100
|
Tue Aug 25 15:33:07 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air! | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 | Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36 |
102
|
Tue Aug 25 18:22:25 2009 |
Manfred Valentan | Pt_ITE512 | Pt_ITE512 40deg NO air! (for calibration) | run041 | 10k | 25.08.2009 18:20:30 | 25.08.2009 | Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36 |
104
|
Wed Aug 26 01:32:25 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009 01:46:38 | 26.08.2009 07:10:14 | Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
105
|
Wed Aug 26 07:19:42 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009 07:18:19 | 26.08.2009 08:46:11 (beam shut down @ 8:00) | Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
|