Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008, Page 1 of 4  Not logged in ELOG logo
IDdown Date Author Project Subject Run Number Events StartTime EndTime
  68   Tue Jun 17 09:43:07 2008 Thomas Bergauer Data analysis progressoverview (in progress)   
run numberWhat?APVDAQ modeTelescope mode#eventshit data processedhitfit processed
0001first attemptrawn.a.51803yesyes
0002LEFT poszsn.a.100kyesyes
0003MID poszsn.a.100kyesyes
0004RIGHT poszsn.a.100kyesyes
2716all sc onrawzs 20000 yesyes
2717wrong posrawzs 6490 nono
2718RIGHT posrawzs100kyesyes
2719MID posrawzs100kyesyes
2720LEFT posrawzs100kyesyes
2721LEFT posrawraw (-2737)22kyesyes
2738telescope pedestal
2739crap
2741MID posrawraw (-2757)22kyesyes
2758RIGHT posrawraw (-2783)34873yesyes
2784-2786telescope something
2787HV=100rawzs30kyesyes
2788HV=10rawzs10kyesyes
2789HV=20rawzs10kyesyes
2790HV=30rawzs10kyesyes
2791HV=40rawzs10kyesyes
2792HV=50rawzs4536yesyes
2821HV=50rawzs10kyesyes
2822HV=60rawzs10kyesyes
2823HV=70rawzs10kyesyes
2824HV=80rawzs10kyesyes
2825HV=90rawzs10kyesyes
2826HV=120rawzs10kyesyes
2827HV=150rawzs10kyesyes
2828HV=200rawzs10kyesyes
2831angle=10degrawzs10kyes yes
2832angle=20degrawzs10kyes yes
2833angle=30degrawzs10kyes yes
2834angle=40degrawzs10kyes yes
2835angle=50degrawzs10kyes yes
2836angle=60degrawzs10kyes yes
2837angle=0degrawzs20kyes yes
28382-dimensional DUTsrawzs478159yes in progress
Attachment 1: Testbeam_CERN_08.xls
  67   Wed Jun 4 15:41:04 2008 Thomas Bergauer end.    
testbeam is over. DUTs and APVDAQ have been dismounted and will be shipped back to Vienna. EUDET telescope is still in H6B and taking data for alignment and pedestal during the night.
  66   Tue Jun 3 18:17:47 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run283847815903.06.2008 18:38:0704.06.2008 10:41:51
SiLC beam test - CERN SPS June 2008
HV=100V, xy "telescope"
8 modules, 40MHz, 6 samples, position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


this is a run where modules 0,2,4,6 are in normal position, while modules 1,3,5,7 are rotated by 90 deg
(counterclockwise as seen by the beam) and flipped (back<->forth) in order to achieve the minimum spacing
(~10.3mm) between "corresponding" x and y planes.
  65   Tue Jun 3 16:53:20 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28372000003.06.2008 16:49:4003.06.2008 17:26:49
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 0 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_00.gif
drehteller_rot_00.gif
Attachment 2: drehteller_rot.cdr
  64   Tue Jun 3 16:14:26 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28361000003.06.2008 16:13:1803.06.2008 16:33:20
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 60 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask

Please note that there are 8 modules read out in this run, but the last one (#7) is placed outside the beam and
hence does not provide any meaningful data.
Attachment 1: drehteller_rot_60.gif
drehteller_rot_60.gif
  63   Tue Jun 3 15:39:57 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28351000003.06.2008 15:36:4703.06.2008 15:55:34
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 50 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_50.gif
drehteller_rot_50.gif
  62   Tue Jun 3 14:59:14 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28341000003.06.2008 14:56:3203.06.2008 15:15:37
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 40 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_40.gif
drehteller_rot_40.gif
  61   Tue Jun 3 14:12:02 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28331000003.06.2008 14:10:4003.06.2008 14:29:26
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 30 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_30.gif
drehteller_rot_30.gif
  60   Tue Jun 3 13:28:15 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28321000003.06.2008 13:24:0703.06.2008 13:53:18
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 20 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_20.gif
drehteller_rot_20.gif
  59   Tue Jun 3 12:41:22 2008 Eudet Telescope useful eudaq software commands(work in progress)   
to show information about a run (number of events, start and end timestamp,....:
./TestReader.exe -b -e 2828
  58   Tue Jun 3 12:32:51 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28311000003.06.2008 12:31:4203.06.2008 13:19:36
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 10 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Attachment 1: drehteller_rot_10.gif
drehteller_rot_10.gif
  57   Tue Jun 3 11:03:27 2008 Thomas Bergauer telescope alignment runrun283038972008-06-03 10:52:16.7832008-06-03 10:58:52.790
telescope run with reduced beam intensity (BEND4=-600A instead of -620A and BEND7=-605A instead of -615A)
Attachment 1: beam_profile_with_modified_BEND4and7.png
beam_profile_with_modified_BEND4and7.png
Attachment 2: hit_correlations.png
hit_correlations.png
  56   Tue Jun 3 10:58:54 2008 Markus FriedlBELLEAPVDAQ onlyped0071000003.06.2008 10:53:0403.06.2008 10:58:47
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity)
  55   Tue Jun 3 09:57:17 2008 Markus FriedlBELLEAPVDAQ onlyrun000710500003.06.2008 09:40:1803.06.2008 10:12:48
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY after software bugfix - apparently works
  54   Tue Jun 3 09:27:27 2008 Markus FriedlBELLEAPVDAQ onlyrun00062392903.06.2008 09:26:1603.06.2008 09:34:22
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY

STUCK again after some time - now adding veto clear in error handling routine
  53   Tue Jun 3 09:12:42 2008 Markus FriedlBELLEAPVDAQ onlyrun00054502003.06.2008 09:11:3003.06.2008 09:24:42
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

SAME AS PREVIOUS, BUT 0-SUP WITHOUT TELESCOPE


stuck after 45020 events with the repeated message  
 ***WARNING*** FIFO3 empty, FADC 0. Event discarded, reset sent.
to be investigated.
  52   Tue Jun 3 02:38:21 2008 Markus FriedlBELLEAPVDAQ + telescope (0-sup)run282910500003.06.2008 02:29:5103.06.2008 09:08:58
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
  50   Tue Jun 3 00:20:06 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28281000002.06.2008 23:55:0603.06.2008 00:18:56
SiLC beam test - CERN SPS June 2008
HV scan,  HV=200V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  49   Mon Jun 2 23:34:29 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28271000002.06.2008 23:33:4002.06.2008 23:52:04
SiLC beam test - CERN SPS June 2008
HV scan,  HV=150V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  48   Mon Jun 2 23:14:58 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run28261000002.06.2008 23:14:1902.06.2008 23:31:29
SiLC beam test - CERN SPS June 2008
HV scan,  HV=120V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
ELOG V3.1.5-fc6679b