Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008  Not logged in ELOG logo
Message ID: 30     Entry time: Sun Jun 1 18:23:38 2008
Author: Markus Friedl 
Project: SiLC 
Subject: Very simple tracking 
Run Number: run2719 
Events: 100000 
StartTime:  
EndTime:  
Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
Simple Center-of-gravity algorithm (as of APVDAQ_Analysis), no eta applied.
Using only events which have exactly 1 hit per plane (~80% of all events).

Results: 
 Residual RMS = 4.99 um (REFERENCE against neighbor layers 2+4 only)
 Residual RMS = 6.35 um (REFERENCE against all 7 other layers) -> needs more sophisticated alignment
Attachment 1: silc_verysimple_res_2REF4.png  72 kB  Uploaded Sun Jun 1 19:33:50 2008  | Show | Show all
Attachment 2: silc_verysimple_res_012REF4567.png  71 kB  Uploaded Sun Jun 1 19:35:10 2008  | Show | Show all
ELOG V3.1.5-fc6679b