Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008  Not logged in ELOG logo
Message ID: 19     Entry time: Sat May 31 18:33:50 2008
Author: Thomas Bergauer 
Project: other 
Subject: beam profile 
Run Number:  
Events:  
StartTime:  
EndTime:  
Beam configuration
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Rate: 5.7E5 particles/spill (measured with SCINT8 in beamline)

Particle Production Applet
Calculator applet

For +120 Gev/c beam:

Pi+55.67 %
p38.95 %
K+ 5.38 %
Attachment 1: Picture_1.png  35 kB  | Show | Hide all | Show all
Attachment 2: beamline_settings.png  61 kB  Uploaded Sun Jun 1 18:31:07 2008  | Hide | Hide all | Show all
beamline_settings.png
ELOG V3.1.5-fc6679b