Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Testbeam at DESY in 2023  Not logged in ELOG logo
Message ID: 503     Entry time: Sun Jul 16 12:23:03 2023
Author: tb-crew 
Subject: cooled unirradiated  
Run Number: 1343 
DUT: RD50-MPW3 
Wafer: unknown 
HV: 90 
Fluence: unirradiated 
Resistivity: 1.9K 
Beam Energy: 4.2 
Rate Setting: Low Flux Low 
Particle Type: electron 
Data: Good 
t-Start: 16.07.2023 11:13:48 
t-Stop: 16.07.2023 12:18:17 
Duration_min: 64 
automatic log for run 1343
Comment:
only 3 top rows, cooled, thr = 0.98V, 1 pixel kind of noisy
Attachment 1: peary_config.cfg  1 kB  | Show | Show all
Attachment 2: matrix_config_base.txt  65 kB  | Show | Show all
Attachment 3: matrix_config_piggy.txt  267 Bytes  | Show | Show all
Attachment 4: eudaq_config.cfg  6 kB  | Show | Show all
ELOG V3.1.5-fc6679b