Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Testbeam at DESY in 2023  Not logged in ELOG logo
Message ID: 410     Entry time: Fri Jul 14 11:39:52 2023
Author: tb-crew 
Subject: threshold optimization 
Run Number: 1269 
DUT: RD50-MPW3 
Wafer: unknown 
HV: 91 
Fluence: unirradiated 
Resistivity: 1.9K 
Beam Energy: 4.2 
Rate Setting: Low Flux Low 
Particle Type: electron 
Data: Good 
t-Start: 14.07.2023 11:32:06 
t-Stop: 14.07.2023 11:35:12 
Duration_min:
automatic log for run 1269
Comment:
thr 1.055, running without beam cause fans examining our setup
is a bit noisy, but not too bad, give it some beam in next run
Attachment 1: peary_config.cfg  1 kB  | Show | Show all
Attachment 2: matrix_config_base.txt  57 kB  | Show | Show all
Attachment 3: matrix_config_piggy.txt  57 kB  | Show | Show all
Attachment 4: eudaq_config.cfg  6 kB  | Show | Show all
ELOG V3.1.5-fc6679b