Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Testbeam at DESY in 2023  Not logged in ELOG logo
Message ID: 12     Entry time: Tue Jul 4 13:47:25 2023
Author: tb-crew 
Subject: initial tests 
Run Number: 595 
DUT: RD50-MPW3 
Wafer: unknown 
HV:  
Fluence: unirradiated 
Resistivity: 1.9K 
Beam Energy: 4.2 
Rate Setting:  
Particle Type: electron 
Data: Crap 
t-Start: 04.07.2023 13:39:33 
t-Stop: 04.07.2023 13:43:18 
Duration_min:
automatic log for run 595
Comment:
DUT biased, kind of aligned, hoping for the best
Attachment 1: peary_config.cfg  1 kB  | Show | Hide all | Show all
Attachment 2: matrix_config_base.txt  267 Bytes  | Hide | Hide all | Show all
# Config-File of the Pixel-Matrix; generated by MPW3-Config-Creator
# each line represents the configuration of an individual pixel
# format: {row} {col} {mask} {en_inj} {hb_en} {en_sfout} {TDAC}

# default values (which are not printed) are:
# {row} {col} 0 0 0 0 -1
Attachment 3: matrix_config_piggy.txt  267 Bytes  | Show | Hide all | Show all
Attachment 4: eudaq_config.cfg  5 kB  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b