Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Testbeam at DESY in 2024  Not logged in ELOG logo
Message ID: 213     Entry time: Wed Apr 24 17:01:47 2024
Author: RD50 Generic User 
Subject:  
Run Number:  
DUT:  
Fluence:  
Beam Energy:  
Data:  
t-Start:  
t-Stop:  
Duration_min:  

geo for rotated sample, 20 degrees still need to be added to the DUT (x -> 200)

full aligned

mask

Attachment 1: detectors_rotated.geo  2 kB  | Show | Hide all | Show all
Attachment 2: full_aligned_backside_hephy_rotated_run_199.geo  2 kB  Uploaded Fri Apr 26 11:52:45 2024  | Show | Hide all | Show all
Attachment 3: mask_hephy_backside.txt  248 Bytes  Uploaded Fri Apr 26 11:52:45 2024  | Hide | Hide all | Show all
p 55 00
p 45 02
p 53 04
p 26 06
p 62 07
p 09 08
p 20 12
p 55 16
p 58 18
p 61 22
p 06 25
p 46 25
p 54 27
p 48 28
p 50 30
p 54 30
p 36 31
p 46 33
p 22 41
p 08 47
p 62 47
p 10 48
p 54 51
p 30 54
p 42 54
p 48 54
p 63 54
p 04 56
p 32 58
p 54 59
p 19 62
ELOG V3.1.5-fc6679b