Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026, Page 5 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend Phantomdown Phantom thickness
  58   Sun Jun 7 04:46:11 2026 elog_producerEnergy Calibration9ToF-iCT-Setup + DS LGAD + Ramon177.8 MeV/uLow Flux HighHeliumUnknown07.06.2026 04:33:5707.06.2026 04:46:2312NormalNone 
automatic log for run 9
Comment:
  59   Sun Jun 7 04:56:18 2026 Harald HanderkasEnergy Calibration8ToF-iCT-Setup + DS LGAD + Ramon205.2 MeV/uLow Flux HighHeliumUnknown   NormalNone 
Comment:
threshold 2500
  60   Sun Jun 7 04:57:46 2026 elog_producerEnergy Calibration10ToF-iCT-Setup + DS LGAD + Ramon147.2 MeV/uLow Flux HighHeliumUnknown07.06.2026 04:48:5707.06.2026 04:57:589NormalNone 
automatic log for run 10
Comment:
  61   Sun Jun 7 05:13:06 2026 elog_producerEnergy Calibration11ToF-iCT-Setup + DS LGAD + Ramon124.4 MeV/uLow Flux HighHeliumUnknown07.06.2026 04:58:3907.06.2026 05:13:1814NormalNone 
automatic log for run 11
Comment:
  62   Sun Jun 7 05:28:09 2026 elog_producerEnergy Calibration12ToF-iCT-Setup + DS LGAD + Ramon97.2MeV/uLow Flux HighHeliumUnknown07.06.2026 05:13:5307.06.2026 05:28:2214NormalNone 
automatic log for run 12
Comment:
eventbuilder eb 811 last files contain run 13 -> delete last files (eb was started 2x with wrong xml)
  63   Sun Jun 7 05:48:23 2026 elog_producerEnergy Calibration13ToF-iCT-Setup + DS LGAD + Ramon73.2 MeV/uLow Flux HighHeliumUnknown07.06.2026 05:29:3907.06.2026 05:48:3518NormalNone 
automatic log for run 13
Comment:
  64   Sun Jun 7 06:09:04 2026 elog_producerEnergy Calibration14ToF-iCT-Setup + DS LGAD + Ramon63.3 MeV/uLow Flux HighHeliumUnknown07.06.2026 05:49:1707.06.2026 06:09:1719NormalNone 
automatic log for run 14
Comment:
  65   Sun Jun 7 06:48:30 2026 elog_producerPhantom Testrun without DAQ15ToF-iCT-Setup + DS LGAD + Ramon124.4 MeV/uLow Flux HighHeliumUnknown07.06.2026 06:43:5107.06.2026 06:48:424NormalNone 
automatic log for run 15
Comment:
  66   Sun Jun 7 11:06:43 2026 elog_producerPhantom Testrun without DAQ16ToF-iCT-Setup + DS LGAD + Ramon124.4 MeV/uLow Flux HighHeliumUnknown07.06.2026 06:49:1507.06.2026 11:06:55257NormalNone 
automatic log for run 16
Comment:
iCT tomographie runs
  86   Sat Jul 11 20:53:37 2026 elog_producerHe Alignment + mixed beam verification6TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup402MeV/uLow Flux HighHeliumUnknown11.07.2026 19:45:1511.07.2026 20:53:3868NormalNone 
automatic log for run 6
Comment:
ohne empty bucket
now ripple filter are in
setup moved by 3mm
moved back by 6mm
He only first sensor: mean is strip 21
last sensor: mean is on strip 19

20:36: go back to mixed beam for verification
alignment looks good for mixed beam
  87   Sat Jul 11 21:13:28 2026 elog_producerEnergy calibration7TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup402MeV/uLow Flux HighHeliumUnknown11.07.2026 21:04:4411.07.2026 21:13:298NormalNone 
automatic log for run 7
Comment:
  88   Sat Jul 11 21:32:42 2026 elog_producerEnergy calibration8TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup205.2 MeV/uLow Flux HighHeliumUnknown11.07.2026 21:14:4111.07.2026 21:32:4318NormalNone 
automatic log for run 8
Comment:
  89   Sat Jul 11 21:51:51 2026 elog_producerEnergy calibration9TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup177.8 MeV/uLow Flux HighHeliumUnknown11.07.2026 21:34:2411.07.2026 21:51:5117NormalNone 
automatic log for run 9
Comment:
changed trigger window to 3ns (21:41)

160khz accept
30khz rejected
  90   Sat Jul 11 22:12:30 2026 elog_producerEnergy calibration10TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup147.2 MeV/uLow Flux HighHeliumUnknown11.07.2026 21:52:2111.07.2026 22:12:3120NormalNone 
automatic log for run 10
Comment:
  91   Sat Jul 11 22:36:50 2026 elog_producerEnergy calibration11TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup124.4 MeV/uLow Flux HighHeliumUnknown11.07.2026 22:12:5711.07.2026 22:36:5023NormalNone 
automatic log for run 11
Comment:
  92   Sat Jul 11 22:54:30 2026 elog_producerEnergy calibration12TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup97.2MeV/uLow Flux HighHeliumUnknown11.07.2026 22:38:1711.07.2026 22:54:3116NormalNone 
automatic log for run 12
Comment:
  93   Sat Jul 11 23:16:45 2026 elog_producerEnergy calibration13TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup73.2 MeV/uLow Flux HighHeliumUnknown11.07.2026 22:55:1311.07.2026 23:16:4621NormalNone 
automatic log for run 13
Comment:
  94   Sat Jul 11 23:42:37 2026 elog_producerEnergy calibration14TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup63.3 MeV/uLow Flux HighHeliumUnknown11.07.2026 23:18:0111.07.2026 23:42:3824NormalNone 
automatic log for run 14
Comment:
deactivated SIPM
  101   Sun Jul 12 06:52:16 2026 elog_producerHead Phantom21TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 02:20:2512.07.2026 06:52:17271NormalHead 
automatic log for run 21
Comment:

Start automatet Spot measurements of head phantom
2:19: thr were not set correctly, no data at beginning of run 21
2:23: reset trigger window to 3us

runs 21-25 high statistics spots
ab run 81: 1mm Platte zusätzlich
  76   Sun Jun 7 13:23:15 2026 elog_producerSandwich ToF calibration304ToF-iCT-Setup + DS LGAD + Ramon124.4 MeV/uLow Flux HighHeliumUnknown07.06.2026 13:14:2407.06.2026 13:23:279NormalDense Bone Slabs1 cm
automatic log for run 304
Comment:
Bone Plate 1 cm
ELOG V3.1.5-fc6679b