| ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Data |
t-Start |
t-Stop |
Duration_min |
Frontend |
Phantom |
Phantom thickness |
|
6
|
Sat Jan 17 10:40:24 2026 |
elog_producer | Rate Test | 8 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux Medium | Helium | Good | 17.01.2026 10:31:12 | 17.01.2026 10:40:28 | 9 | Normal | None | |
automatic log for run 8
Comment:
trigger window: 85ns post, 1.915 us pre |
|
7
|
Sat Jan 17 10:48:31 2026 |
elog_producer | Rate Test | 9 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Good | 17.01.2026 10:42:23 | 17.01.2026 10:48:35 | 6 | Normal | None | |
automatic log for run 9
Comment:
trigger window 85 ns post, 1.915 us pre, 70mb/s events, 15mb/s drop |
|
8
|
Sat Jan 17 10:55:49 2026 |
elog_producer | Rate Test | 10 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Good | 17.01.2026 10:51:15 | 17.01.2026 10:55:53 | 4 | Normal | None | |
automatic log for run 10
Comment:
trigger window 85 ns post, 640 ns pre, 52mb/s events, 4mb/s drop, 9E+6 particle rate ramon |
|
9
|
Sat Jan 17 11:00:50 2026 |
elog_producer | Rate Test | 11 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Good | 17.01.2026 10:57:22 | 17.01.2026 11:00:54 | 3 | Normal | None | |
automatic log for run 11
Comment:
trigger window 85ns post, 2.915 us pre, 80mb/s events, 25mb/s drop, 9E+6 particle rate ramon |
|
10
|
Sat Jan 17 11:06:15 2026 |
elog_producer | Rate Test | 12 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Good | 17.01.2026 11:02:01 | 17.01.2026 11:06:19 | 4 | Normal | None | |
automatic log for run 12
Comment:
trigger window 85ns post, 3.915 us pre, 100mb/s events, 40mb/s drop, 9E+6 particle rate ramon |
|
11
|
Sat Jan 17 11:13:44 2026 |
elog_producer | Rate Test | 13 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux Medium | Helium | Good | 17.01.2026 11:06:51 | 17.01.2026 11:13:48 | 6 | Normal | None | |
automatic log for run 13
Comment:
trigger window 85ns post, 3.915 us pre, 33mb/s events, 1mb/s drop, 4E+6 particle rate ramon |
|
12
|
Sat Jan 17 11:30:05 2026 |
elog_producer | Rate Test | 14 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux Medium | Helium | Good | 17.01.2026 11:14:46 | 17.01.2026 11:30:09 | 15 | Normal | None | |
automatic log for run 14
Comment:
trigger window 85ns post, 2.915 us pre, 30mb/s events, 0.6mb/s drop, 4E+6 particle rate ramon |
|
13
|
Sat Jan 17 11:33:33 2026 |
elog_producer | Rate Test | 15 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux Low | Helium | Good | 17.01.2026 11:31:19 | 17.01.2026 11:33:37 | 2 | Normal | None | |
automatic log for run 15
Comment:
trigger window 85ns post, 2.915 us pre, 25kb/s events, 0mb/s drop, 6E+3 particle rate ramon |
|
55
|
Sun Jun 7 03:44:28 2026 |
elog_producer | Rate Test | 5 | ToF-iCT-Setup + DS LGAD + Ramon | 402MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 03:23:49 | 07.06.2026 03:44:40 | 20 | Normal | None | |
automatic log for run 5
Comment:
3 us trigger window
110 mb/s /eb
rejected: 70 mb/s |
|
56
|
Sun Jun 7 04:04:12 2026 |
elog_producer | Rate Test | 6 | ToF-iCT-Setup + DS LGAD + Ramon | 402MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 03:52:48 | 07.06.2026 04:04:24 | 11 | Normal | None | |
automatic log for run 6
Comment:
new threshold scan
trigger window: 200 ns
threshold at 1500 |
|
85
|
Sat Jul 11 19:34:51 2026 |
elog_producer | Rate Test | 5 | TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup | 200 MeV/u | Nominal | Mixed Beam (He+C) | Unknown | 11.07.2026 19:01:26 | 11.07.2026 19:34:51 | 33 | Normal | RW3 | |
automatic log for run 5
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
trigger on plane 4
use max rate settings (nominal with 10% He) of mixed beam
rate per strip: 60-90khz for front detector
about MHz per detector
data written: 12MB/s per eb
absolut: 50 MB/s leading |
|
83
|
Sat Jul 11 18:48:23 2026 |
elog_producer | QA+alignment | 3 | TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup | 200 MeV/u | Nominal | Mixed Beam (He+C) | Unknown | 11.07.2026 18:19:25 | 11.07.2026 18:48:24 | 28 | Normal | RW3 | |
automatic log for run 3
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Alignment mixed beam:
y-axis: aligned
x-axis: maximum at strip 18 (setup is 4-5 strips off to the right (beam is left))
SIPM
18:45: thr rescanned |
|
67
|
Sun Jun 7 11:09:39 2026 |
Harald Handerkas | Phantom iCT runs log entries | 16-295 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 06:49:15 | 07.06.2026 11:06:55 | 257 | Normal | Cylinder with inserts | |
| Run settings and log file for runs |
|
65
|
Sun Jun 7 06:48:30 2026 |
elog_producer | Phantom Testrun without DAQ | 15 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 06:43:51 | 07.06.2026 06:48:42 | 4 | Normal | None | |
automatic log for run 15
Comment: |
|
66
|
Sun Jun 7 11:06:43 2026 |
elog_producer | Phantom Testrun without DAQ | 16 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 06:49:15 | 07.06.2026 11:06:55 | 257 | Normal | None | |
automatic log for run 16
Comment:
iCT tomographie runs |
|
101
|
Sun Jul 12 06:52:16 2026 |
elog_producer | Head Phantom | 21 | TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup | 200 MeV/u | Nominal | Mixed Beam (He+C) | Unknown | 12.07.2026 02:20:25 | 12.07.2026 06:52:17 | 271 | Normal | Head | |
automatic log for run 21
Comment:
Start automatet Spot measurements of head phantom
2:19: thr were not set correctly, no data at beginning of run 21
2:23: reset trigger window to 3us
runs 21-25 high statistics spots
ab run 81: 1mm Platte zusätzlich |
|
86
|
Sat Jul 11 20:53:37 2026 |
elog_producer | He Alignment + mixed beam verification | 6 | TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup | 402MeV/u | Low Flux High | Helium | Unknown | 11.07.2026 19:45:15 | 11.07.2026 20:53:38 | 68 | Normal | None | |
automatic log for run 6
Comment:
ohne empty bucket
now ripple filter are in
setup moved by 3mm
moved back by 6mm
He only first sensor: mean is strip 21
last sensor: mean is on strip 19
20:36: go back to mixed beam for verification
alignment looks good for mixed beam |
|
52
|
Sun Jun 7 01:18:32 2026 |
elog_producer | GSI Sensor Test | 2 | ToF-iCT-Setup + DS LGAD + Ramon | 800 MeV | Low Flux High | Proton | Unknown | 07.06.2026 00:37:15 | 07.06.2026 01:18:44 | 41 | Normal | None | |
automatic log for run 2
Comment: |
|
53
|
Sun Jun 7 02:41:32 2026 |
elog_producer | GSI Sensor Test | 3 | ToF-iCT-Setup + DS LGAD + Ramon | 800 MeV | Low Flux High | Proton | Unknown | 07.06.2026 01:19:47 | 07.06.2026 02:41:43 | 81 | Normal | None | |
automatic log for run 3
Comment:
Trigger on last detector |
|
80
|
Sat Jul 11 16:26:54 2026 |
elog_producer | GSI Sensor Test | 1 | TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup | 800 MeV | Low Flux High | Proton | Unknown | 11.07.2026 16:17:29 | 11.07.2026 16:26:54 | 9 | Normal | RW3 | |
automatic log for run 1
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Powersupply failed, restart in next run |