Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026, Page 4 of 6  Not logged in ELOG logo
ID Date Author Subject Run Numberdown DUT Beam Energy Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend Phantom Phantom thickness
  21   Sat Jan 17 13:24:58 2026 elog_producerenergy calibration23ToF-iCT-Setup + DS LGAD + Ramon63.3 MeV/uLow Flux HighHeliumGood17.01.2026 12:54:3317.01.2026 13:25:0230NormalNone 
automatic log for run 23
Comment:
trigger window 85ns post, 1.915 us pre, 30mb/s events, 0.6mb/s drop, 2.5E+5 particle rate ramon, dogma 160kHz
  20   Sat Jan 17 12:53:45 2026 elog_producerenergy calibration22ToF-iCT-Setup + DS LGAD + Ramon73.2 MeV/uLow Flux HighHeliumGood17.01.2026 12:30:2417.01.2026 12:53:4923NormalNone 
automatic log for run 22
Comment:
trigger window 85ns post, 1.915 us pre, 31mb/s events, 1mb/s drop, 1.8E+6 particle rate ramon, dogma 160kHz
  19   Sat Jan 17 12:29:24 2026 elog_producerenergy calibration21ToF-iCT-Setup + DS LGAD + Ramon97.2MeV/uLow Flux HighHeliumGood17.01.2026 12:21:4317.01.2026 12:29:277NormalNone 
automatic log for run 21
Comment:
trigger window 85ns post, 1.915 us pre, 51mb/s events, 6mb/s drop, 6.4E+6 particle rate ramon, dogma 160kHz
  101   Sun Jul 12 06:52:16 2026 elog_producerHead Phantom21TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 02:20:2512.07.2026 06:52:17271NormalHead 
automatic log for run 21
Comment:

Start automatet Spot measurements of head phantom
2:19: thr were not set correctly, no data at beginning of run 21
2:23: reset trigger window to 3us

runs 21-25 high statistics spots
ab run 81: 1mm Platte zusätzlich
  18   Sat Jan 17 12:20:18 2026 elog_producerenergy calibration20ToF-iCT-Setup + DS LGAD + Ramon147.2 MeV/uLow Flux HighHeliumGood17.01.2026 12:11:1817.01.2026 12:20:219NormalNone 
automatic log for run 20
Comment:
trigger window 85ns post, 1.915 us pre, 65mb/s events, 11mb/s drop, 8E+6 particle rate ramon, dogma 160kHz
  100   Sun Jul 12 01:12:43 2026 elog_producerSlabs20TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 01:06:3612.07.2026 01:12:436NormalRW313 cm
automatic log for run 20
Comment:
He only
  52   Sun Jun 7 01:18:32 2026 elog_producerGSI Sensor Test2ToF-iCT-Setup + DS LGAD + Ramon800 MeVLow Flux HighProtonUnknown07.06.2026 00:37:1507.06.2026 01:18:4441NormalNone 
automatic log for run 2
Comment:
  82   Sat Jul 11 17:35:21 2026 elog_producerGSI Sensor Test2TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup800 MeVLow Flux HighProtonUnknown11.07.2026 17:24:2811.07.2026 17:35:2110NormalRW3 
automatic log for run 2
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3

Testing DS LGAD/SIPM, trigger on DS
DS: thr 1000-200
SIPM thr scan, current limit: 300uA, saturated at 250 uA
thr:1000
  17   Sat Jan 17 12:09:44 2026 elog_producerenergy calibration19ToF-iCT-Setup + DS LGAD + Ramon177.8 MeV/uLow Flux HighHeliumGood17.01.2026 12:01:4517.01.2026 12:09:488NormalNone 
automatic log for run 19
Comment:
trigger window 85ns post, 1.915 us pre, 81mb/s events, 40mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz
  99   Sun Jul 12 01:06:26 2026 elog_producerSlabs19TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 00:55:5212.07.2026 01:06:2610NormalRW313 cm
automatic log for run 19
Comment:
Carbon only
  16   Sat Jan 17 12:00:49 2026 elog_producerenergy calibration18ToF-iCT-Setup + DS LGAD + Ramon205.2 MeV/uLow Flux HighHeliumGood17.01.2026 11:52:1817.01.2026 12:00:538NormalNone 
automatic log for run 18
Comment:
trigger window 85ns post, 1.915 us pre, 84mb/s events, 50mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz
  98   Sun Jul 12 00:54:55 2026 elog_producerSlabs18TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 00:41:4612.07.2026 00:54:5613NormalRW313 cm
automatic log for run 18
Comment:
mixed beam
TDC died again (00:50)
TDC back again (00:53)
  15   Sat Jan 17 11:50:32 2026 elog_produceralignment run17ToF-iCT-Setup + DS LGAD + Ramon402MeV/uLow Flux HighHeliumGood17.01.2026 11:39:2017.01.2026 11:50:3511NormalNone 
automatic log for run 17
Comment:
trigger window 85ns post, 1.915 us pre, 87mb/s events, 77mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz
  97   Sun Jul 12 00:40:25 2026 elog_producerSlabs17TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 00:23:0312.07.2026 00:40:2617NormalRW315 cm
automatic log for run 17
Comment:
Carbon only
  67   Sun Jun 7 11:09:39 2026 Harald HanderkasPhantom iCT runs log entries16-295ToF-iCT-Setup + DS LGAD + Ramon124.4 MeV/uLow Flux HighHeliumUnknown07.06.2026 06:49:1507.06.2026 11:06:55257NormalCylinder with inserts 
Run settings and log file for runs
  14   Sat Jan 17 11:37:32 2026 elog_produceralignment run16ToF-iCT-Setup + DS LGAD + Ramon402MeV/uLow Flux HighHeliumGood17.01.2026 11:34:3717.01.2026 11:37:362NormalNone 
automatic log for run 16
Comment:
trigger window 85ns post, 2.915 us pre, 95mb/s events, 100mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz
  66   Sun Jun 7 11:06:43 2026 elog_producerPhantom Testrun without DAQ16ToF-iCT-Setup + DS LGAD + Ramon124.4 MeV/uLow Flux HighHeliumUnknown07.06.2026 06:49:1507.06.2026 11:06:55257NormalNone 
automatic log for run 16
Comment:
iCT tomographie runs
  96   Sun Jul 12 00:22:16 2026 elog_producerSlabs16TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 00:06:2812.07.2026 00:22:1615NormalRW315 cm
automatic log for run 16
Comment:
Helium only
lost one TDC (00:09)
back again (00:18)
  13   Sat Jan 17 11:33:33 2026 elog_producerRate Test15ToF-iCT-Setup + DS LGAD + Ramon124.4 MeV/uLow Flux LowHeliumGood17.01.2026 11:31:1917.01.2026 11:33:372NormalNone 
automatic log for run 15
Comment:
trigger window 85ns post, 2.915 us pre, 25kb/s events, 0mb/s drop, 6E+3 particle rate ramon
  65   Sun Jun 7 06:48:30 2026 elog_producerPhantom Testrun without DAQ15ToF-iCT-Setup + DS LGAD + Ramon124.4 MeV/uLow Flux HighHeliumUnknown07.06.2026 06:43:5107.06.2026 06:48:424NormalNone 
automatic log for run 15
Comment:
ELOG V3.1.5-fc6679b