Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026, Page 2 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energydown Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend Phantom Phantom thickness
  14   Sat Jan 17 11:37:32 2026 elog_produceralignment run16ToF-iCT-Setup + DS LGAD + Ramon402MeV/uLow Flux HighHeliumGood17.01.2026 11:34:3717.01.2026 11:37:362NormalNone 
automatic log for run 16
Comment:
trigger window 85ns post, 2.915 us pre, 95mb/s events, 100mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz
  15   Sat Jan 17 11:50:32 2026 elog_produceralignment run17ToF-iCT-Setup + DS LGAD + Ramon402MeV/uLow Flux HighHeliumGood17.01.2026 11:39:2017.01.2026 11:50:3511NormalNone 
automatic log for run 17
Comment:
trigger window 85ns post, 1.915 us pre, 87mb/s events, 77mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz
  50   Sat Jan 17 22:02:29 2026 elog_producersensor test55ToF-iCT-Setup + DS LGAD + Ramon402MeV/udeg10CarbonGood17.01.2026 21:30:2717.01.2026 22:02:3432NormalNone 
automatic log for run 55
Comment:
trigger window 85ns post, 1.915 us pre, 999mb/s events, 999mb/s drop, 1E+7 particle rate ramon, dogma 130kHz
  51   Sun Jun 7 00:30:29 2026 elog_producerTest DAQ1ToF-iCT-Setup + DS LGAD + Ramon402MeV/uLow Flux HighHeliumUnknown07.06.2026 00:19:4307.06.2026 00:30:4110NormalNone 
automatic log for run 1
Comment:
402.8 MeV/u
Aufnahme: 150kHz
Schreiben: 250Mbyte/s
  54   Sun Jun 7 03:20:58 2026 elog_producerAlignment He4ToF-iCT-Setup + DS LGAD + Ramon402MeV/uLow Flux HighHeliumUnknown07.06.2026 02:59:5507.06.2026 03:21:1021NormalNone 
automatic log for run 4
Comment:
Alignment run
70 MB/s / eb
  55   Sun Jun 7 03:44:28 2026 elog_producerRate Test5ToF-iCT-Setup + DS LGAD + Ramon402MeV/uLow Flux HighHeliumUnknown07.06.2026 03:23:4907.06.2026 03:44:4020NormalNone 
automatic log for run 5
Comment:
3 us trigger window
110 mb/s /eb
rejected: 70 mb/s
  56   Sun Jun 7 04:04:12 2026 elog_producerRate Test6ToF-iCT-Setup + DS LGAD + Ramon402MeV/uLow Flux HighHeliumUnknown07.06.2026 03:52:4807.06.2026 04:04:2411NormalNone 
automatic log for run 6
Comment:
new threshold scan

trigger window: 200 ns
threshold at 1500
  86   Sat Jul 11 20:53:37 2026 elog_producerHe Alignment + mixed beam verification6TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup402MeV/uLow Flux HighHeliumUnknown11.07.2026 19:45:1511.07.2026 20:53:3868NormalNone 
automatic log for run 6
Comment:
ohne empty bucket
now ripple filter are in
setup moved by 3mm
moved back by 6mm
He only first sensor: mean is strip 21
last sensor: mean is on strip 19

20:36: go back to mixed beam for verification
alignment looks good for mixed beam
  87   Sat Jul 11 21:13:28 2026 elog_producerEnergy calibration7TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup402MeV/uLow Flux HighHeliumUnknown11.07.2026 21:04:4411.07.2026 21:13:298NormalNone 
automatic log for run 7
Comment:
  16   Sat Jan 17 12:00:49 2026 elog_producerenergy calibration18ToF-iCT-Setup + DS LGAD + Ramon205.2 MeV/uLow Flux HighHeliumGood17.01.2026 11:52:1817.01.2026 12:00:538NormalNone 
automatic log for run 18
Comment:
trigger window 85ns post, 1.915 us pre, 84mb/s events, 50mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz
  57   Sun Jun 7 04:22:48 2026 elog_producerEnergy Calibration7ToF-iCT-Setup + DS LGAD + Ramon205.2 MeV/uLow Flux HighHeliumUnknown07.06.2026 04:06:0907.06.2026 04:23:0016NormalNone 
automatic log for run 7
Comment:
  59   Sun Jun 7 04:56:18 2026 Harald HanderkasEnergy Calibration8ToF-iCT-Setup + DS LGAD + Ramon205.2 MeV/uLow Flux HighHeliumUnknown   NormalNone 
Comment:
threshold 2500
  88   Sat Jul 11 21:32:42 2026 elog_producerEnergy calibration8TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup205.2 MeV/uLow Flux HighHeliumUnknown11.07.2026 21:14:4111.07.2026 21:32:4318NormalNone 
automatic log for run 8
Comment:
  83   Sat Jul 11 18:48:23 2026 elog_producerQA+alignment3TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown11.07.2026 18:19:2511.07.2026 18:48:2428NormalRW3 
automatic log for run 3
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3

Alignment mixed beam:
y-axis: aligned
x-axis: maximum at strip 18 (setup is 4-5 strips off to the right (beam is left))

SIPM
18:45: thr rescanned
  84   Sat Jul 11 19:00:26 2026 elog_producerSIPM Test4TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown11.07.2026 18:50:0511.07.2026 19:00:2610NormalRW3 
automatic log for run 4
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3

trigger on SIPM
thr 500
signal on 32
31 noise
16 is missing

18:54: move position
now 16 is back
  85   Sat Jul 11 19:34:51 2026 elog_producerRate Test5TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown11.07.2026 19:01:2611.07.2026 19:34:5133NormalRW3 
automatic log for run 5
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3

trigger on plane 4
use max rate settings (nominal with 10% He) of mixed beam
rate per strip: 60-90khz for front detector
about MHz per detector
data written: 12MB/s per eb
absolut: 50 MB/s leading
  95   Sun Jul 12 00:05:23 2026 elog_producerSlabs15TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown11.07.2026 23:53:2412.07.2026 00:05:2411NormalRW315 cm
automatic log for run 15
Comment:
15 cm RW3
418 MB written
  96   Sun Jul 12 00:22:16 2026 elog_producerSlabs16TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 00:06:2812.07.2026 00:22:1615NormalRW315 cm
automatic log for run 16
Comment:
Helium only
lost one TDC (00:09)
back again (00:18)
  97   Sun Jul 12 00:40:25 2026 elog_producerSlabs17TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 00:23:0312.07.2026 00:40:2617NormalRW315 cm
automatic log for run 17
Comment:
Carbon only
  98   Sun Jul 12 00:54:55 2026 elog_producerSlabs18TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup200 MeV/uNominalMixed Beam (He+C)Unknown12.07.2026 00:41:4612.07.2026 00:54:5613NormalRW313 cm
automatic log for run 18
Comment:
mixed beam
TDC died again (00:50)
TDC back again (00:53)
ELOG V3.1.5-fc6679b