Sat Jan 17 11:37:32 2026, elog_producer, alignment run, 16, ToF-iCT-Setup + DS LGAD + Ramon, 402MeV/u, Low Flux High, Helium, Good, 17.01.2026 11:34:37, 17.01.2026 11:37:36, 2, Normal, None,
|
automatic log for run 16
Comment:
trigger window 85ns post, 2.915 us pre, 95mb/s events, 100mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz |
Sat Jan 17 11:50:32 2026, elog_producer, alignment run, 17, ToF-iCT-Setup + DS LGAD + Ramon, 402MeV/u, Low Flux High, Helium, Good, 17.01.2026 11:39:20, 17.01.2026 11:50:35, 11, Normal, None,
|
automatic log for run 17
Comment:
trigger window 85ns post, 1.915 us pre, 87mb/s events, 77mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz |
Sat Jan 17 22:02:29 2026, elog_producer, sensor test, 55, ToF-iCT-Setup + DS LGAD + Ramon, 402MeV/u, deg10, Carbon, Good, 17.01.2026 21:30:27, 17.01.2026 22:02:34, 32, Normal, None,
|
automatic log for run 55
Comment:
trigger window 85ns post, 1.915 us pre, 999mb/s events, 999mb/s drop, 1E+7 particle rate ramon, dogma 130kHz |
Sun Jun 7 00:30:29 2026, elog_producer, Test DAQ, 1, ToF-iCT-Setup + DS LGAD + Ramon, 402MeV/u, Low Flux High, Helium, Unknown, 07.06.2026 00:19:43, 07.06.2026 00:30:41, 10, Normal, None,
|
automatic log for run 1
Comment:
402.8 MeV/u
Aufnahme: 150kHz
Schreiben: 250Mbyte/s |
Sun Jun 7 03:20:58 2026, elog_producer, Alignment He, 4, ToF-iCT-Setup + DS LGAD + Ramon, 402MeV/u, Low Flux High, Helium, Unknown, 07.06.2026 02:59:55, 07.06.2026 03:21:10, 21, Normal, None,
|
automatic log for run 4
Comment:
Alignment run
70 MB/s / eb |
Sun Jun 7 03:44:28 2026, elog_producer, Rate Test, 5, ToF-iCT-Setup + DS LGAD + Ramon, 402MeV/u, Low Flux High, Helium, Unknown, 07.06.2026 03:23:49, 07.06.2026 03:44:40, 20, Normal, None,
|
automatic log for run 5
Comment:
3 us trigger window
110 mb/s /eb
rejected: 70 mb/s |
Sun Jun 7 04:04:12 2026, elog_producer, Rate Test, 6, ToF-iCT-Setup + DS LGAD + Ramon, 402MeV/u, Low Flux High, Helium, Unknown, 07.06.2026 03:52:48, 07.06.2026 04:04:24, 11, Normal, None,
|
automatic log for run 6
Comment:
new threshold scan
trigger window: 200 ns
threshold at 1500 |
Sat Jul 11 20:53:37 2026, elog_producer, He Alignment + mixed beam verification, 6, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 402MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 19:45:15, 11.07.2026 20:53:38, 68, Normal, None,
|
automatic log for run 6
Comment:
ohne empty bucket
now ripple filter are in
setup moved by 3mm
moved back by 6mm
He only first sensor: mean is strip 21
last sensor: mean is on strip 19
20:36: go back to mixed beam for verification
alignment looks good for mixed beam |
Sat Jul 11 21:13:28 2026, elog_producer, Energy calibration, 7, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 402MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 21:04:44, 11.07.2026 21:13:29, 8, Normal, None,
|
automatic log for run 7
Comment: |
Sat Jan 17 12:00:49 2026, elog_producer, energy calibration, 18, ToF-iCT-Setup + DS LGAD + Ramon, 205.2 MeV/u, Low Flux High, Helium, Good, 17.01.2026 11:52:18, 17.01.2026 12:00:53, 8, Normal, None,
|
automatic log for run 18
Comment:
trigger window 85ns post, 1.915 us pre, 84mb/s events, 50mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz |
Sun Jun 7 04:22:48 2026, elog_producer, Energy Calibration, 7, ToF-iCT-Setup + DS LGAD + Ramon, 205.2 MeV/u, Low Flux High, Helium, Unknown, 07.06.2026 04:06:09, 07.06.2026 04:23:00, 16, Normal, None,
|
automatic log for run 7
Comment: |
Sun Jun 7 04:56:18 2026, Harald Handerkas, Energy Calibration, 8, ToF-iCT-Setup + DS LGAD + Ramon, 205.2 MeV/u, Low Flux High, Helium, Unknown, , , , Normal, None,
|
Comment:
threshold 2500 |
Sat Jul 11 21:32:42 2026, elog_producer, Energy calibration, 8, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 205.2 MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 21:14:41, 11.07.2026 21:32:43, 18, Normal, None,
|
automatic log for run 8
Comment: |
Sat Jul 11 18:48:23 2026, elog_producer, QA+alignment, 3, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 11.07.2026 18:19:25, 11.07.2026 18:48:24, 28, Normal, RW3,
|
automatic log for run 3
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Alignment mixed beam:
y-axis: aligned
x-axis: maximum at strip 18 (setup is 4-5 strips off to the right (beam is left))
SIPM
18:45: thr rescanned |
Sat Jul 11 19:00:26 2026, elog_producer, SIPM Test, 4, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 11.07.2026 18:50:05, 11.07.2026 19:00:26, 10, Normal, RW3,
|
automatic log for run 4
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
trigger on SIPM
thr 500
signal on 32
31 noise
16 is missing
18:54: move position
now 16 is back |
Sat Jul 11 19:34:51 2026, elog_producer, Rate Test, 5, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 11.07.2026 19:01:26, 11.07.2026 19:34:51, 33, Normal, RW3,
|
automatic log for run 5
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
trigger on plane 4
use max rate settings (nominal with 10% He) of mixed beam
rate per strip: 60-90khz for front detector
about MHz per detector
data written: 12MB/s per eb
absolut: 50 MB/s leading |
Sun Jul 12 00:05:23 2026, elog_producer, Slabs, 15, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 11.07.2026 23:53:24, 12.07.2026 00:05:24, 11, Normal, RW3, 15 cm
|
automatic log for run 15
Comment:
15 cm RW3
418 MB written |
Sun Jul 12 00:22:16 2026, elog_producer, Slabs, 16, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 12.07.2026 00:06:28, 12.07.2026 00:22:16, 15, Normal, RW3, 15 cm
|
automatic log for run 16
Comment:
Helium only
lost one TDC (00:09)
back again (00:18) |
Sun Jul 12 00:40:25 2026, elog_producer, Slabs, 17, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 12.07.2026 00:23:03, 12.07.2026 00:40:26, 17, Normal, RW3, 15 cm
|
automatic log for run 17
Comment:
Carbon only |
Sun Jul 12 00:54:55 2026, elog_producer, Slabs, 18, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 12.07.2026 00:41:46, 12.07.2026 00:54:56, 13, Normal, RW3, 13 cm
|
automatic log for run 18
Comment:
mixed beam
TDC died again (00:50)
TDC back again (00:53) |
|