Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026, Page 1 of 6  Not logged in ELOG logo
Entry  Sun Jul 12 06:52:16 2026, elog_producer, Head Phantom, 21, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 12.07.2026 02:20:25, 12.07.2026 06:52:17, 271, Normal, Head,  ramon.conflog_file.csv
automatic log for run 21
Comment:
Entry  Sun Jul 12 01:12:43 2026, elog_producer, Slabs, 20, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 12.07.2026 01:06:36, 12.07.2026 01:12:43, 6, Normal, RW3, 13 cm ramon.conf
automatic log for run 20
Comment:
He only
Entry  Sun Jul 12 01:06:26 2026, elog_producer, Slabs, 19, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 12.07.2026 00:55:52, 12.07.2026 01:06:26, 10, Normal, RW3, 13 cm ramon.conf
automatic log for run 19
Comment:
Carbon only
Entry  Sun Jul 12 00:54:55 2026, elog_producer, Slabs, 18, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 12.07.2026 00:41:46, 12.07.2026 00:54:56, 13, Normal, RW3, 13 cm ramon.conf
automatic log for run 18
Comment:
mixed beam
Entry  Sun Jul 12 00:40:25 2026, elog_producer, Slabs, 17, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 12.07.2026 00:23:03, 12.07.2026 00:40:26, 17, Normal, RW3, 15 cm ramon.conf
automatic log for run 17
Comment:
Carbon only
Entry  Sun Jul 12 00:22:16 2026, elog_producer, Slabs, 16, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 12.07.2026 00:06:28, 12.07.2026 00:22:16, 15, Normal, RW3, 15 cm ramon.conf
automatic log for run 16
Comment:
Helium only
Entry  Sun Jul 12 00:05:23 2026, elog_producer, Slabs, 15, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 11.07.2026 23:53:24, 12.07.2026 00:05:24, 11, Normal, RW3, 15 cm ramon.conf
automatic log for run 15
Comment:
15 cm RW3
Entry  Sat Jul 11 23:42:37 2026, elog_producer, Energy calibration, 14, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 63.3 MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 23:18:01, 11.07.2026 23:42:38, 24, Normal, None,  ramon.conf
automatic log for run 14
Comment:
deactivated SIPM
Entry  Sat Jul 11 23:16:45 2026, elog_producer, Energy calibration, 13, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 73.2 MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 22:55:13, 11.07.2026 23:16:46, 21, Normal, None,  ramon.conf
automatic log for run 13
Comment:
Entry  Sat Jul 11 22:54:30 2026, elog_producer, Energy calibration, 12, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 97.2MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 22:38:17, 11.07.2026 22:54:31, 16, Normal, None,  ramon.conf
automatic log for run 12
Comment:
Entry  Sat Jul 11 22:36:50 2026, elog_producer, Energy calibration, 11, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 124.4 MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 22:12:57, 11.07.2026 22:36:50, 23, Normal, None,  ramon.conf
automatic log for run 11
Comment:
Entry  Sat Jul 11 22:12:30 2026, elog_producer, Energy calibration, 10, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 147.2 MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 21:52:21, 11.07.2026 22:12:31, 20, Normal, None,  ramon.conf
automatic log for run 10
Comment:
Entry  Sat Jul 11 21:51:51 2026, elog_producer, Energy calibration, 9, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 177.8 MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 21:34:24, 11.07.2026 21:51:51, 17, Normal, None,  ramon.conf
automatic log for run 9
Comment:
changed trigger window to 3ns (21:41)
Entry  Sat Jul 11 21:32:42 2026, elog_producer, Energy calibration, 8, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 205.2 MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 21:14:41, 11.07.2026 21:32:43, 18, Normal, None,  ramon.conf
automatic log for run 8
Comment:
Entry  Sat Jul 11 21:13:28 2026, elog_producer, Energy calibration, 7, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 402MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 21:04:44, 11.07.2026 21:13:29, 8, Normal, None,  ramon.conf
automatic log for run 7
Comment:
Entry  Sat Jul 11 20:53:37 2026, elog_producer, He Alignment + mixed beam verification, 6, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 402MeV/u, Low Flux High, Helium, Unknown, 11.07.2026 19:45:15, 11.07.2026 20:53:38, 68, Normal, None,  ramon.conf
automatic log for run 6
Comment:
ohne empty bucket
Entry  Sat Jul 11 19:34:51 2026, elog_producer, Rate Test, 5, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 11.07.2026 19:01:26, 11.07.2026 19:34:51, 33, Normal, RW3,  ramon.conf
automatic log for run 5
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Entry  Sat Jul 11 19:00:26 2026, elog_producer, SIPM Test, 4, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 11.07.2026 18:50:05, 11.07.2026 19:00:26, 10, Normal, RW3,  ramon.conf
automatic log for run 4
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Entry  Sat Jul 11 18:48:23 2026, elog_producer, QA+alignment, 3, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 200 MeV/u, Nominal, Mixed Beam (He+C), Unknown, 11.07.2026 18:19:25, 11.07.2026 18:48:24, 28, Normal, RW3,  ramon.conf
automatic log for run 3
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Entry  Sat Jul 11 17:35:21 2026, elog_producer, GSI Sensor Test, 2, TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup, 800 MeV, Low Flux High, Proton, Unknown, 11.07.2026 17:24:28, 11.07.2026 17:35:21, 10, Normal, RW3,  ramon.conf
automatic log for run 2
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
ELOG V3.1.5-fc6679b