Home
CMS Production
Clean room
MedAustron
HEPHY
testbeams
old
testbeam-MA2018
testbeam-MA2019
testbeam-MA2020
testbeam-MA2021
testbeam-MA2023
testbeam-MA2024
testbeam-MA2025
testbeam-MA2026
Testbeams at MedAustron in 2026, Page 1 of 6
Not logged in
Find
|
Login
|
Help
Full |
Summary
|
Threaded
|
Show attachments
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- DUT --
common
DSSD-Tracker
RD50-MPW4
TJ-Monopix2
TOF-Cal GSI
RaMon
TOF-Cal GSI \(TRB)+DOGMA setup\(diamond+LGAD)+RaMon
Sandwich-iCT setup\(GSI)+RaMon
TOF-Cal_GSI_8LGAD+RaMon
ToF-iCT-Setup + DS LGAD + Ramon
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
-- Beam Energy --
800 MeV
252.7 MeV
194.3 MeV
175.3 MeV
145.4 MeV
100.4 MeV
83 MeV
62.4 MeV
115.7MeV
205.2 MeV/u
177.8 MeV/u
147.2 MeV/u
124.4 MeV/u
97.2MeV/u
73.2 MeV/u
63.3 MeV/u
402MeV/u
200 MeV/u
130.8 MeV/u
101 Entries
Goto page 1,
2
,
3
,
4
,
5
,
6
Next
All
ID
Date
Author
Subject
Run Number
DUT
Beam Energy
Rate Setting
Particle Type
Data
t-Start
t-Stop
Duration_min
Frontend
Phantom
Phantom thickness
101
Sun Jul 12 06:52:16 2026
elog_producer
Head Phantom
21
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
12.07.2026 02:20:25
12.07.2026 06:52:17
271
Normal
Head
automatic log for run 21
Comment:
Start automatet Spot measurements of head phantom
2:19: thr were not set correctly, no data at beginning of run 21
2:23: reset trigger window to 3us
runs 21-25 high statistics spots
ab run 81: 1mm Platte zusätzlich
100
Sun Jul 12 01:12:43 2026
elog_producer
Slabs
20
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
12.07.2026 01:06:36
12.07.2026 01:12:43
6
Normal
RW3
13 cm
automatic log for run 20
Comment:
He only
99
Sun Jul 12 01:06:26 2026
elog_producer
Slabs
19
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
12.07.2026 00:55:52
12.07.2026 01:06:26
10
Normal
RW3
13 cm
automatic log for run 19
Comment:
Carbon only
98
Sun Jul 12 00:54:55 2026
elog_producer
Slabs
18
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
12.07.2026 00:41:46
12.07.2026 00:54:56
13
Normal
RW3
13 cm
automatic log for run 18
Comment:
mixed beam
TDC died again (00:50)
TDC back again (00:53)
97
Sun Jul 12 00:40:25 2026
elog_producer
Slabs
17
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
12.07.2026 00:23:03
12.07.2026 00:40:26
17
Normal
RW3
15 cm
automatic log for run 17
Comment:
Carbon only
96
Sun Jul 12 00:22:16 2026
elog_producer
Slabs
16
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
12.07.2026 00:06:28
12.07.2026 00:22:16
15
Normal
RW3
15 cm
automatic log for run 16
Comment:
Helium only
lost one TDC (00:09)
back again (00:18)
95
Sun Jul 12 00:05:23 2026
elog_producer
Slabs
15
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
11.07.2026 23:53:24
12.07.2026 00:05:24
11
Normal
RW3
15 cm
automatic log for run 15
Comment:
15 cm RW3
418 MB written
94
Sat Jul 11 23:42:37 2026
elog_producer
Energy calibration
14
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
63.3 MeV/u
Low Flux High
Helium
Unknown
11.07.2026 23:18:01
11.07.2026 23:42:38
24
Normal
None
automatic log for run 14
Comment:
deactivated SIPM
93
Sat Jul 11 23:16:45 2026
elog_producer
Energy calibration
13
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
73.2 MeV/u
Low Flux High
Helium
Unknown
11.07.2026 22:55:13
11.07.2026 23:16:46
21
Normal
None
automatic log for run 13
Comment:
92
Sat Jul 11 22:54:30 2026
elog_producer
Energy calibration
12
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
97.2MeV/u
Low Flux High
Helium
Unknown
11.07.2026 22:38:17
11.07.2026 22:54:31
16
Normal
None
automatic log for run 12
Comment:
91
Sat Jul 11 22:36:50 2026
elog_producer
Energy calibration
11
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
124.4 MeV/u
Low Flux High
Helium
Unknown
11.07.2026 22:12:57
11.07.2026 22:36:50
23
Normal
None
automatic log for run 11
Comment:
90
Sat Jul 11 22:12:30 2026
elog_producer
Energy calibration
10
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
147.2 MeV/u
Low Flux High
Helium
Unknown
11.07.2026 21:52:21
11.07.2026 22:12:31
20
Normal
None
automatic log for run 10
Comment:
89
Sat Jul 11 21:51:51 2026
elog_producer
Energy calibration
9
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
177.8 MeV/u
Low Flux High
Helium
Unknown
11.07.2026 21:34:24
11.07.2026 21:51:51
17
Normal
None
automatic log for run 9
Comment:
changed trigger window to 3ns (21:41)
160khz accept
30khz rejected
88
Sat Jul 11 21:32:42 2026
elog_producer
Energy calibration
8
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
205.2 MeV/u
Low Flux High
Helium
Unknown
11.07.2026 21:14:41
11.07.2026 21:32:43
18
Normal
None
automatic log for run 8
Comment:
87
Sat Jul 11 21:13:28 2026
elog_producer
Energy calibration
7
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
402MeV/u
Low Flux High
Helium
Unknown
11.07.2026 21:04:44
11.07.2026 21:13:29
8
Normal
None
automatic log for run 7
Comment:
86
Sat Jul 11 20:53:37 2026
elog_producer
He Alignment + mixed beam verification
6
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
402MeV/u
Low Flux High
Helium
Unknown
11.07.2026 19:45:15
11.07.2026 20:53:38
68
Normal
None
automatic log for run 6
Comment:
ohne empty bucket
now ripple filter are in
setup moved by 3mm
moved back by 6mm
He only first sensor: mean is strip 21
last sensor: mean is on strip 19
20:36: go back to mixed beam for verification
alignment looks good for mixed beam
85
Sat Jul 11 19:34:51 2026
elog_producer
Rate Test
5
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
11.07.2026 19:01:26
11.07.2026 19:34:51
33
Normal
RW3
automatic log for run 5
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
trigger on plane 4
use max rate settings (nominal with 10% He) of mixed beam
rate per strip: 60-90khz for front detector
about MHz per detector
data written: 12MB/s per eb
absolut: 50 MB/s leading
84
Sat Jul 11 19:00:26 2026
elog_producer
SIPM Test
4
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
11.07.2026 18:50:05
11.07.2026 19:00:26
10
Normal
RW3
automatic log for run 4
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
trigger on SIPM
thr 500
signal on 32
31 noise
16 is missing
18:54: move position
now 16 is back
83
Sat Jul 11 18:48:23 2026
elog_producer
QA+alignment
3
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
200 MeV/u
Nominal
Mixed Beam (He+C)
Unknown
11.07.2026 18:19:25
11.07.2026 18:48:24
28
Normal
RW3
automatic log for run 3
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Alignment mixed beam:
y-axis: aligned
x-axis: maximum at strip 18 (setup is 4-5 strips off to the right (beam is left))
SIPM
18:45: thr rescanned
82
Sat Jul 11 17:35:21 2026
elog_producer
GSI Sensor Test
2
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup
800 MeV
Low Flux High
Proton
Unknown
11.07.2026 17:24:28
11.07.2026 17:35:21
10
Normal
RW3
automatic log for run 2
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Testing DS LGAD/SIPM, trigger on DS
DS: thr 1000-200
SIPM thr scan, current limit: 300uA, saturated at 250 uA
thr:1000
Goto page 1,
2
,
3
,
4
,
5
,
6
Next
All
ELOG V3.1.5-fc6679b