| ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Data |
t-Start |
t-Stop |
Duration_min |
Frontend |
Phantom |
Phantom thickness |
|
6
|
Sat Jan 17 10:40:24 2026 |
elog_producer | Rate Test | 8 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux Medium | Helium | Good | 17.01.2026 10:31:12 | 17.01.2026 10:40:28 | 9 | Normal | None | |
automatic log for run 8
Comment:
trigger window: 85ns post, 1.915 us pre |
|
18
|
Sat Jan 17 12:20:18 2026 |
elog_producer | energy calibration | 20 | ToF-iCT-Setup + DS LGAD + Ramon | 147.2 MeV/u | Low Flux High | Helium | Good | 17.01.2026 12:11:18 | 17.01.2026 12:20:21 | 9 | Normal | None | |
automatic log for run 20
Comment:
trigger window 85ns post, 1.915 us pre, 65mb/s events, 11mb/s drop, 8E+6 particle rate ramon, dogma 160kHz |
|
60
|
Sun Jun 7 04:57:46 2026 |
elog_producer | Energy Calibration | 10 | ToF-iCT-Setup + DS LGAD + Ramon | 147.2 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 04:48:57 | 07.06.2026 04:57:58 | 9 | Normal | None | |
automatic log for run 10
Comment: |
|
76
|
Sun Jun 7 13:23:15 2026 |
elog_producer | Sandwich ToF calibration | 304 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 13:14:24 | 07.06.2026 13:23:27 | 9 | Normal | Dense Bone Slabs | 1 cm |
automatic log for run 304
Comment:
Bone Plate 1 cm |
|
79
|
Sun Jun 7 13:57:40 2026 |
elog_producer | Sandwich ToF calibration | 307 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 13:48:48 | 07.06.2026 13:57:52 | 9 | Normal | bone+lung | 2 cm |
automatic log for run 307
Comment:
first 1cm lung, then 1 cm bone (in beam direction) |
|
80
|
Sat Jul 11 16:26:54 2026 |
elog_producer | GSI Sensor Test | 1 | TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup | 800 MeV | Low Flux High | Proton | Unknown | 11.07.2026 16:17:29 | 11.07.2026 16:26:54 | 9 | Normal | RW3 | |
automatic log for run 1
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Powersupply failed, restart in next run |
|
53
|
Sun Jun 7 02:41:32 2026 |
elog_producer | GSI Sensor Test | 3 | ToF-iCT-Setup + DS LGAD + Ramon | 800 MeV | Low Flux High | Proton | Unknown | 07.06.2026 01:19:47 | 07.06.2026 02:41:43 | 81 | Normal | None | |
automatic log for run 3
Comment:
Trigger on last detector |
|
16
|
Sat Jan 17 12:00:49 2026 |
elog_producer | energy calibration | 18 | ToF-iCT-Setup + DS LGAD + Ramon | 205.2 MeV/u | Low Flux High | Helium | Good | 17.01.2026 11:52:18 | 17.01.2026 12:00:53 | 8 | Normal | None | |
automatic log for run 18
Comment:
trigger window 85ns post, 1.915 us pre, 84mb/s events, 50mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz |
|
17
|
Sat Jan 17 12:09:44 2026 |
elog_producer | energy calibration | 19 | ToF-iCT-Setup + DS LGAD + Ramon | 177.8 MeV/u | Low Flux High | Helium | Good | 17.01.2026 12:01:45 | 17.01.2026 12:09:48 | 8 | Normal | None | |
automatic log for run 19
Comment:
trigger window 85ns post, 1.915 us pre, 81mb/s events, 40mb/s drop, 1.15E+7 particle rate ramon, dogma 160kHz |
|
75
|
Sun Jun 7 13:08:43 2026 |
elog_producer | Sandwich ToF calibration | 303 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 13:00:37 | 07.06.2026 13:08:55 | 8 | Normal | RW3 Plate | 2.5 cm |
automatic log for run 303
Comment:
RW Plate 2.5 cm |
|
87
|
Sat Jul 11 21:13:28 2026 |
elog_producer | Energy calibration | 7 | TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup | 402MeV/u | Low Flux High | Helium | Unknown | 11.07.2026 21:04:44 | 11.07.2026 21:13:29 | 8 | Normal | None | |
automatic log for run 7
Comment: |
|
19
|
Sat Jan 17 12:29:24 2026 |
elog_producer | energy calibration | 21 | ToF-iCT-Setup + DS LGAD + Ramon | 97.2MeV/u | Low Flux High | Helium | Good | 17.01.2026 12:21:43 | 17.01.2026 12:29:27 | 7 | Normal | None | |
automatic log for run 21
Comment:
trigger window 85ns post, 1.915 us pre, 51mb/s events, 6mb/s drop, 6.4E+6 particle rate ramon, dogma 160kHz |
|
32
|
Sat Jan 17 17:50:08 2026 |
elog_producer | radiographie | 37 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux Medium | Helium | Good | 17.01.2026 17:43:02 | 17.01.2026 17:50:12 | 7 | Normal | None | |
automatic log for run 37
Comment:
trigger window 85ns post, 1.915 us pre, 999mb/s events, 999mb/s drop, 5E+6 particle rate ramon, dogma 160kHz, x=0, y=-2, forsetzung von run036 |
|
71
|
Sun Jun 7 12:15:21 2026 |
elog_producer | Sandwich ToF calibration | 299 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 12:08:02 | 07.06.2026 12:15:33 | 7 | Normal | RW3 Plate | 4 cm |
automatic log for run 299
Comment:
RW Plate 4 cm |
|
72
|
Sun Jun 7 12:28:00 2026 |
elog_producer | Sandwich ToF calibration | 300 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 12:21:05 | 07.06.2026 12:28:13 | 7 | Normal | RW3 Plate | 1 mm |
automatic log for run 300
Comment:
RW Plate 1 mm |
|
78
|
Sun Jun 7 13:44:55 2026 |
elog_producer | Sandwich ToF calibration | 306 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Unknown | 07.06.2026 13:37:47 | 07.06.2026 13:45:07 | 7 | Normal | bone+lung | 2 cm |
automatic log for run 306
Comment:
first 1 cm bone, then 1cm lung (in beam direction) |
|
86
|
Sat Jul 11 20:53:37 2026 |
elog_producer | He Alignment + mixed beam verification | 6 | TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup | 402MeV/u | Low Flux High | Helium | Unknown | 11.07.2026 19:45:15 | 11.07.2026 20:53:38 | 68 | Normal | None | |
automatic log for run 6
Comment:
ohne empty bucket
now ripple filter are in
setup moved by 3mm
moved back by 6mm
He only first sensor: mean is strip 21
last sensor: mean is on strip 19
20:36: go back to mixed beam for verification
alignment looks good for mixed beam |
|
1
|
Sat Jan 17 09:35:25 2026 |
elog_producer | Test | 0 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Nominal | Helium | Unknown | 17.01.2026 08:29:29 | 17.01.2026 09:35:28 | 65 | Normal | None | |
automatic log for run 0
Comment:
System Test |
|
7
|
Sat Jan 17 10:48:31 2026 |
elog_producer | Rate Test | 9 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux High | Helium | Good | 17.01.2026 10:42:23 | 17.01.2026 10:48:35 | 6 | Normal | None | |
automatic log for run 9
Comment:
trigger window 85 ns post, 1.915 us pre, 70mb/s events, 15mb/s drop |
|
11
|
Sat Jan 17 11:13:44 2026 |
elog_producer | Rate Test | 13 | ToF-iCT-Setup + DS LGAD + Ramon | 124.4 MeV/u | Low Flux Medium | Helium | Good | 17.01.2026 11:06:51 | 17.01.2026 11:13:48 | 6 | Normal | None | |
automatic log for run 13
Comment:
trigger window 85ns post, 3.915 us pre, 33mb/s events, 1mb/s drop, 4E+6 particle rate ramon |