Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026  Not logged in ELOG logo
Message ID: 86     Entry time: Sat Jul 11 20:53:37 2026
Author: elog_producer 
Subject: He Alignment + mixed beam verification 
Run Number:
DUT: TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup 
Beam Energy: 402MeV/u 
Rate Setting: Low Flux High 
Particle Type: Helium 
Data: Unknown 
t-Start: 11.07.2026 19:45:15 
t-Stop: 11.07.2026 20:53:38 
Duration_min: 68 
Frontend: Normal 
Phantom: None 
Phantom thickness:  
automatic log for run 6
Comment:
ohne empty bucket
now ripple filter are in
setup moved by 3mm
moved back by 6mm
He only first sensor: mean is strip 21
last sensor: mean is on strip 19

20:36: go back to mixed beam for verification
alignment looks good for mixed beam
Attachment 1: ramon.conf  3 kB  | Show | Show all
ELOG V3.1.5-fc6679b