Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026  Not logged in ELOG logo
Message ID: 83     Entry time: Sat Jul 11 18:48:23 2026
Author: elog_producer 
Subject: QA+alignment 
Run Number:
DUT: TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup 
Beam Energy: 200 MeV/u 
Rate Setting: Nominal 
Particle Type: Mixed Beam (He+C) 
Data: Unknown 
t-Start: 11.07.2026 18:19:25 
t-Stop: 11.07.2026 18:48:24 
Duration_min: 28 
Frontend: Normal 
Phantom: RW3 
Phantom thickness:  
automatic log for run 3
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3

Alignment mixed beam:
y-axis: aligned
x-axis: maximum at strip 18 (setup is 4-5 strips off to the right (beam is left))

SIPM
18:45: thr rescanned
Attachment 1: ramon.conf  3 kB  | Show | Show all
ELOG V3.1.5-fc6679b