| Testbeams at MedAustron in 2026 |
Not logged in |
 |
|
|
Message ID: 83
Entry time: Sat Jul 11 18:48:23 2026
|
| Author: |
elog_producer |
| Subject: |
QA+alignment |
| Run Number: |
3 |
| DUT: |
TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup |
| Beam Energy: |
200 MeV/u |
| Rate Setting: |
Nominal |
| Particle Type: |
Mixed Beam (He+C) |
| Data: |
Unknown |
| t-Start: |
11.07.2026 18:19:25 |
| t-Stop: |
11.07.2026 18:48:24 |
| Duration_min: |
28 |
| Frontend: |
Normal |
| Phantom: |
RW3 |
| Phantom thickness: |
|
|
|
automatic log for run 3
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3
Alignment mixed beam:
y-axis: aligned
x-axis: maximum at strip 18 (setup is 4-5 strips off to the right (beam is left))
SIPM
18:45: thr rescanned |
|