Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026  Not logged in ELOG logo
Message ID: 82     Entry time: Sat Jul 11 17:35:21 2026
Author: elog_producer 
Subject: GSI Sensor Test 
Run Number:
DUT: TOF-Cal_GSI_8LGAD+RaMon+SIPM-Setup 
Beam Energy: 800 MeV 
Rate Setting: Low Flux High 
Particle Type: Proton 
Data: Unknown 
t-Start: 11.07.2026 17:24:28 
t-Stop: 11.07.2026 17:35:21 
Duration_min: 10 
Frontend: Normal 
Phantom: RW3 
Phantom thickness:  
automatic log for run 2
Comment:
In beam: 3 cm RW3 + PTW34070 Ionization Chamber + 11 cm RW3 + PTW34070 Ionization Chamber + 1 cm RW3

Testing DS LGAD/SIPM, trigger on DS
DS: thr 1000-200
SIPM thr scan, current limit: 300uA, saturated at 250 uA
thr:1000
Attachment 1: ramon.conf  3 kB  | Show | Show all
ELOG V3.1.5-fc6679b