Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026  Not logged in ELOG logo
Message ID: 7     Entry time: Sat Jan 17 10:48:31 2026
Author: elog_producer 
Subject: Rate Test 
Run Number:
DUT: ToF-iCT-Setup + DS LGAD + Ramon 
Beam Energy: 124.4 MeV/u 
Rate Setting: Low Flux High 
Particle Type: Helium 
Data: Good 
t-Start: 17.01.2026 10:42:23 
t-Stop: 17.01.2026 10:48:35 
Duration_min:
Frontend: Normal 
Phantom: None 
Phantom thickness:  
automatic log for run 9
Comment:
trigger window 85 ns post, 1.915 us pre, 70mb/s events, 15mb/s drop
Attachment 1: ramon.conf  3 kB  | Show | Show all
ELOG V3.1.5-fc6679b