Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026  Not logged in ELOG logo
Message ID: 74     Entry time: Sun Jun 7 12:56:29 2026
Author: elog_producer 
Subject: Sandwich ToF calibration 
Run Number: 302 
DUT: ToF-iCT-Setup + DS LGAD + Ramon 
Beam Energy: 124.4 MeV/u 
Rate Setting: Low Flux High 
Particle Type: Helium 
Data: Unknown 
t-Start: 07.06.2026 12:45:21 
t-Stop: 07.06.2026 12:56:41 
Duration_min: 11 
Frontend: Normal 
Phantom: RW3 Plate 
Phantom thickness: 1.5 cm 
automatic log for run 302
Comment:
RW Plate 1.5 cm
downtime (~2min), restart network (10GB links)
Attachment 1: ramon.conf  3 kB  | Show | Show all
ELOG V3.1.5-fc6679b