Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025 testbeam-MA2026
  Testbeams at MedAustron in 2026  Not logged in ELOG logo
Message ID: 22     Entry time: Sat Jan 17 13:33:39 2026
Author: elog_producer 
Subject: energy calibration 
Run Number: 24 
DUT: ToF-iCT-Setup + DS LGAD + Ramon 
Beam Energy: 130.8 MeV/u 
Rate Setting: Low Flux Medium 
Particle Type: Proton 
Data: Good 
t-Start: 17.01.2026 13:30:27 
t-Stop: 17.01.2026 13:33:42 
Duration_min:
Frontend: Normal 
Phantom: None 
Phantom thickness:  
automatic log for run 24
Comment:
trigger window 85ns post, 1.915 us pre, 1mb/s events, 0mb/s drop, 2.5E+5 particle rate ramon, dogma 160kHz
Attachment 1: ramon.conf  3 kB  | Show | Show all
ELOG V3.1.5-fc6679b