80Mb/s Events and 20Mb/s rejected
PreTriggerWindow 3360ns and PostTriggerWindow 640ns
axis 1: 13
axis 2: -4
45Mb/s Events and 1Mb/s rejected
PreTriggerWindow 640ns and PostTriggerWindow 85ns
PreTriggerWindow: 640ns and PostTriggerWindow: 3.36µs
25Mb/s Events and 25Mb/s rejected
3360ns PreTriggerWindow and 640ns PostTriggerWindow
Had to restart eventbuilder at 19:39 due to high rejected rate
60Mb/s Events and 10-15Mb/s rejected
Threshold change from 50 to 500
10GB collected
RaMon Rate 1.5MHz
new callibration was done, dimanond detector connected to readout
Threshold = 4000
thresholds were too low -> run was canceled
Run nr. 12 wasn't recorded.
new calib from this run on
RaMon Rate 1.5 MHz
adjusted threshold for double-sided LGAD (accounted for polarity of signal)
Threshold set to 2000
50GB data collected
Room Entry Request: 18:21
threshold = 2000
Threshold set to 4000
40GB data collected
Threshold set to 3000
moved Ripple filters back in
100GB data collected
17:43: eventbuilder restart since lots of rejected triggers
RaMon Rate: 1.3MHz
PreTriggerWindow 640ns und PostTriggerWindow 85ns
Data was good, we have to shuft the setup in x direction and slightly down. Enter room request 17:12.